Web Content Display
SALES CIRCULARS 2006
Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2005 , 2004 , 2003 , 2002 , 2001 , 2000 , DST Circulars & Instructions
Sales Circular No. | Subject | Sales Instruction No. | Subject |
U-01-2006.doc | Scheme for out of court settlement of pending court cases. | 01/2006 | Temporary empanelment of firms for 3 phase 4 wire Static LT CT meters with MDI features. |
U-02-2006.doc | Voluntary Scheme for declaration of un-authorized loads - VDS - 2006. | 02/2006 | Temporary empanelment of firms for purchase of 3 phase, 4 wire Whole current electronic meter with MDI of 10-60 A rating by consumers. |
U-03-2006.doc | Release of tubewell connections- maintaining of separate seniority of applications. | 03/2006 | Temporary empanelment of firms for purchase of 3 phase, 4 wire Whole current electronic meter with MCB of 20-60 A rating with MDI facility by consumers. |
U-04-2006.doc | Grant of Industrial connections- Procedure for fixing seniority. | 04/2006 | Temporary empanelment of firms for the purchase of 33 KV CTs/PTs for purchase by the consumer. |
U-05-2006.doc | Independent feeders for Govt. Disposal Plants, Govt. treatment Plants and Govt. Chilling Plants having total connected load of 100 KW and above. | 05/2006 | Temporary empanelment of firms for purchase of single-phase electronic meters (with electromechanical counter) of rating 5-20A/10-40A with MCB. |
U-06-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 18th Clarification. | 06/2006 | HERC Regulations No. HERC/12/2005 on "Duty to supply on request" under Section-43 of the Electricity Act-2003. |
U-07-2006.doc | Settlement of Pending Electricity Bills of Rural Domestic and Agriculture category of consumers in rural areas. | 07/2006 | Withdrawal of Sales Instruction No. U-2/2006 i.e. to cancel the Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole Current Electronic Meter of 10-60 Amps rating with MDI facility. |
U-08-2006.doc | Levy of fuel surcharge on power consumers in UHBVN. | 08/2006 | Temporary empanelment of firms for 3 phase 4 wire LT CT operated Static Energy Meters. |
U-09-2006.doc | Providing of LT-CT operated Static Energy Meters. | 09/2006 | Ban on use of phase changer in case of three phase supply consumers. |
U-10-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 20th Clarification. | 10/2006 | Display of stock balance of important items on Notice Board in front of SDO's office. |
U-11-2006.doc | Designation Appellate Authority as Provided under Section-127 of the Electricity Act-2003. | 11/2006 | Providing meter terminal cover and cover seals (sealing of meters). |
U-12-2006.doc | Providing of 25/63/100 KVA transformers by applicants for release of LT industrial connections. | 12/2006 | Installation of LT capacitors by LT industrial & AP consumers. |
U-13-2006.doc | Interest on Consumption Security Deposit for the year 2005-06. | 13/2006 | Verification of Test Reports. |
U-14-2006.doc | Railway traction Tariff- Regarding SOP charges and imposition of incentive/penalty on account of Power Factor- Clarification thereof. | 14/2006 | Terminology of Electronics meters as Digital meters. |
U-15-2006.doc | Establishment of Forum for the redressal of grievances of consumers as per the provisions of Section-42 of the EA-2003. | 15/2006 | Re-utilization of electronic meters dismantled from consumer premises. |
U-16-2006.doc | Deduction of amount of energy bills from the Salary of employees of Power utilities. | 16/2006 | Procedure for the return of un-accounted for, out-dated, defective and burnt energy meters to M&T Lab/Store. |
U-17-2006.doc | Levy of surcharge on power consumers in UHBVN viz-a-viz with-holding of implementation thereof. | 17/2006 | Temporary empanelment of firm's for purchase of Single-phase LT Static energy meters (with electromagnetic counter) of rating 5-20 A/10-40 A with MCB. |
U-18-2006.doc | Release of power connection to the tubewells under General Category. | 18/2006 | Temporary Empanelment of firm's for purchase of 3 phase 4 wire LT-CT operated Static energy meters. |
U-19-2006.doc | Billing of Domestic and Non-domestic consumers during the period when the meters remain defective/dead stop & billing has been raised on ‘Faulty Meter basis.' | 19/2006 | Temporary Empanelment of firm's for purchase of Single- Phase LT Static energy meters (with electromagnetic counter) if rating 5-20 A/10-40 A with MCB. |
U-20-2006.doc | Synchronization of Captive Generation with Grid System of UHBVN. | 20/2006 | Temporary Empanelment of firm's for purchase of 3 phase, 4 wire whole current LT Static energy meter of rating 10-60 Amps having MDI facility with MCB. |
U-21-2006.doc | Providing dedicated transformers to a Group of existing LT Agriculture Pumping Category consumers. | 21/2006 | Shifting of load of consumers from urban to rural mode of supply. |
U-22-2006.doc | Release of Power Connection to tubewells under AP category. | 22/2006 | Temporary Empanelment of firm's for purchase of 3 phase 4 wire LT Static energy meters (with electromagnetic counter) of rating 10-40 A with MCB. |
U-23-2006.doc | Recording of complete address in consumer ledger. | 23/2006 | Temporary Empanelment of firm's for purchase of 3 phase 4 wire Whole current LT Static energy meter of rating 10-60 Amps having MDI facility with MCB. |
U-24-2006.doc | Providing of 25/63/100 KVA transformer by applicants for release of LT industrial connection - withdrawal of sales circular | 24/2006 | Temporary Empanelment of firm's for purchase of 3 phase 4 wire Whole current LT Static energy meter of rating 20-60 Amps having MDI facility with MCB. |
U-25-2006.doc | Filing of appeal in the Higher Court where the decision is against the Nigam | 25/2006 | Temporary Empanelment of firms for purchase of LT CTs, 11 KV CTs and 11KV PTs to be supplied by the consumers. |
U-26-2006.doc | Providing of LT-CT operated Static Energy meters | 26/2006 | Temporary Empanelment of firm's for purchase of 3 phase 4 wire LT-CT Operated Static Energy meters. |
U-27-2006.doc | Recording correct address of consumer in the ledger and guarantee for payment from owner of premises. | 27/2006 | Cancellation of Temporary Empanelment of M/s Bentex Linger Switchgear Co., New Delhi for purchase of single phased electronic meter with electromagnetic counter) of rating 5-20 Amps/10-40 Amps with MCB. |
U-28-2006.doc | Deduction of amount of energy bills from the salary of employees of Power Utilities. | 28/2006 | Guidelines for dealing with electrification plan of Group Housing Societies. |
U-29-2006.doc | Defending of theft of Energy cases in the District Consumer Redressing Forum | 29/2006 | Temporary Empanelment of firms for purchase of 3 phase 4 wire Whole current LT Static energy meter of rating 20-60 Amps having MDI facility with MCB. |
U-30-2006.doc | Release of Power connection to tubewells under AP category- Revival of cancelled applications | 30/2006 | Temporary Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11KV PTs to be supplied by the consumers. |
U-31-2006.doc | Providing of LT-CT operated Static Energy meters | 31/2006 | Construction of industrial feeder for group of industries having load of 1 MW or above. |
U-32-2006.doc | Procedure for making cases for theft of electricity and unauthorized use of electricity under EA-2003 | 32/2006 | Procedure for checking of premises and detection of theft of electricity cases. |
U-33-2006.doc | Levy of surcharge on Bulk Supply Consumers for exceeding the sanctioned load/contract demand | 33/2006 | Temporary empanelment of firms for purchase of 33 KV CTs / PTs for purchase by the consumer. |
U-34-2006.doc | Filing of appeal in the higher court where the decision is against the Nigam | 34/2006 | To shift the meter of all DS/NDS consumers outside the premises who are currently fed through underground cable. |
U-35-2006.doc | Recording correct address of consumer in the ledger and guarantee for payment from owner of premises | 35/2006 | Release of tubewell connections-identification of site through G.P.S. (Global Positioning Satellites). |
U-36-2006.doc | Installation of DT meters on the distribution transformers feeding the Agriculture load | 36/2006 | Temporary Empanelment of firm for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. |
U-37-2006.doc | Interest on staff security, meter security and consumption security deposit for the year 2006-07 | 37/2006 | (i) Shifting of load of Non-Domestic Connections from rural to urban feeder. (ii) Release of Non-Domestic Connections from urban feeders instead of rural feeder whereas rural feeder is near to the premises of NDS consumer. |
U-38-2006.doc | Hiring of Nigam's poles for laying cable TV network by Small Cable TV operators | 38/2006 | Installation of single-phase Static Energy meters of Rating 10-60A with MCB received against Purchase Order No. HH-5886 dated 10.02.2006 placed on M/s Capital Power System Ltd. for the supply of 1,25,000 Nos. |
U-39-2006.doc | Recording correct address of consumer in the ledger and guarantee for payment from owner of premises | 39/2006 | Construction of residences/other buildings beneath LT/HT lines. |
U-40-2006.doc | Shifting of meter of DS/NDS category outside the premises of the consumer | 40/2006 | Policy in respect of Essential Feeders. |
U-41-2006.doc | Conversion of Existing LT Bulk Supply Consumers with load above 70 KW to HT supply | 41/2006 | To make entry of reading of check meter in ledger. |
U-42-2006.doc | Accounting of Distribution transformers etc. installed by Private Colonizers, HUDA & by Cooperative/Group Housing Societies as property of Nigam | 42/2006 | Replacement of PVC cable with armored cables. |
U-43-2006.doc | HERC Regulations No. HERC/12/2005 on "Power to Require Security" under Section-47 of the Electricity Act-2003- Revision of Consumption Security of Existing Consumers | 43/2006 | Displaying of seniority list of new connections and other works. |
U-44-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 21st Clarification | 44/2006 | HERC regulations on duty to supply electricity on request –Self-execution of works. |
U-45-2006.doc | Dedicated transformer for LT Industrial consumers and installation of DT meters | 45/2006 | Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 20-60 Amps having MDI facility with MCB. |
U-46-2006.doc | Construction of industrial feeder for group of industries having load of 1 MW or above | 46/2006 | Temporary Empanelment of firms for purchase of 3 phase, 4 wire LT Static energy meters (with impulse counter) of ration 10-40 A with MCB. |
U-47-2006.doc | Penalty for un-authorised extension in load on LT industrial consumers- change in category from LT to HT | 47/2006 | Issue rate for Single Phase and Three Phase Meters of various rating with MCB for the year 2006-07. |
U-48-2006.doc | Instructions for dealing an act of abetment for theft of electricity under Section-150 of the Electricity Act, 2003. | 48/2006 | Grant of one connection in a premises- clubbing. |
U-49-2006.doc | Facility of advance payment of electricity bills by consumers. | 49/2006 | Temporary Empanelment of firms for purchase of LT CTs, 11KV CTs and 11 KV PTs to be supplied by the consumers. |
U-50-2006.doc | Sealing of meters - Use of seals | 50/2006 | Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT static energy meter of rating 10-60 Amps having MDI facility with MCB. |
U-51-2006.doc | Release of power connection to tubewells under AP category | 51/2006 | Extension of Delhi Metro to Gurgaon – regarding funding of Delhi Segment and Approval of Draft Agreement with DMRCL – Giving exemption from payment of Electricity Duty. |
U-52-2006.doc | Voluntary Scheme for declaration of un-authorized loads of DS, NDS and Agriculture Power Consumers - 2nd VDS - 2006 | ||
U-53-2006.doc | Procedure for making appeal to Designated Appellate Authority in cases of theft of electricity under section -135 of the Electricity Act - 2003 | ||
U-54-2006.doc | Instructions for dealing with the cases of unauthorized use of electricity and theft of electricity under section-126 and 135 of EA-2003. | ||
U-55-2006.doc | Release of connections in slum areas viz-a-viz Rates of consumption security for new domestic connections. | ||
U-56-2006.doc | Dedicated transformer for LT Industrial consumers and installation of DT meters. | ||
U-57-2006.doc | Site Checking of Meters. | ||
U-58-2006.doc | i) Installation of meters outside the consumers premises after detection of theft of electricity/ un-authorized use of electricity. ii) Installation of meters outside the consumers premises while releasing new connections or replacement of meter. | ||
U-59-2006.doc | Levy of peak load exemption charges for power supplied during peak load hours. | ||
U-60-2006.doc | Regularization of Kundi connections in rural areas – Recovery of Meter Security and Consumption Security in installments. | ||
U-61-2006.doc | Reduction in surcharge on unpaid bills. | ||
U-62-2006.doc | Scheme of incentives and rewards for the employees and officers of UHBVNL. | ||
U-63-2006.doc | Serving of notice upon consumers before debiting short assessment. | ||
U-64-2006.doc | Release of temporary connection – amendments. | ||
U-65-2006.doc | Instructions for dealing with the cases of unauthorized use of electricity and theft of electricity under section-126 and 135 of EA-2003. | ||
U-66-2006.doc | Shifting of industrial connection from one site to another due to technical constraints. | ||
U-67-2006.doc | Release of power connection to the tubewells through individual/ dedicated transformer. | ||
U-68-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 22nd Clarification. | ||
U-69-2006.doc | Shifting of industrial connection from one site to another due to technical constraints. | ||
U-70-2006.doc | Delivery of Electricity Bill. | ||
U-71-2006.doc | Printed Receipts for the requests/written complaints received in Sub-division/division/Circle offices. | ||
U-72-2006.doc | Revised rate of electricity tariff for Horticulture & Fisheries. | ||
U-73-2006.doc | Directions for efficient use of energy and its conservation in the State of Haryana. | ||
U-74-2006.doc | Replacement of Electro-Mechanical Meters with Electronic Meters with MCB. | ||
U-75-2006.doc | Separate schedule of tariff for Bulk Domestic and Bulk Non-Domestic category of consumers. | ||
U-76-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas-23rd Clarification. | ||
U-77-2006.doc | Replacement of Electro-Mechanical Meters with Electronic Meters with MCB. | ||
U-78-2006.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 24th Clarification. | ||
U-79-2006.doc | Billing of Domestic and Non-domestic consumers during the period when the meters remain defective/dead stop & billing has been raised on ‘Faulty Meter basis.' | ||
U-80-2006.doc | Shifting of meter of DS/NDS category outside the premises of the consumer. | ||
U-81-2006.doc | Mode of payment of bills by consumer. | ||
U-82-2006.doc | Instructions for dealing with the cases of unauthorized use of electricity and theft of electricity under section-126 and 135 of EA-2003 respectively. | ||
U-83-2006.doc | Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN. | ||
U-84-2006.doc | Interest on staff security, meter security and consumption security deposit for the year 2006-2007. | ||
U-85-2006.doc | Conversion of feeding source from rural to urban mode. | ||
U-86-2006.doc | Voluntary Scheme for declaration of un-authorized loads of DS, NDS and Agriculture Power Consumers – 3rd VDS – 2006. | ||
U-87-2006.doc | Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN. | ||
U-88-2006.doc | Providing dedicated transformers to individual/group of existing LT Agriculture pumping category consumers on turn key basis. |