Web Content Display
SALES CIRCULARS 2005
Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2006 , 2004 , 2003 , 2002 , 2001 , 2000 , DST Circulars & Instructions
Sales Circular No. | Subject | Sales Insruction No. | Subject |
U-01-2005.doc | Shifting of tubewell connection from one site to another in the event of acquisition of land by HUDA or other state agencies | 01-2005.doc | Temporary empanelment of firms for 3 phase 4 wires static LT CT meters with MDI features. |
U-02-2005.doc | Instructions for dealing with the cases of Theft of Electricity under section-135 of the Electricity Act-2003 | 02-2005.doc | Removal of cable, meter and other equipment from consumer's premises while effecting PDCO. |
U-03-2005.doc | Instructions for dealing with the cases of unauthorized use of Electricity under section-126 of the Electricity Act-2003. | 03-2005.doc | Temporary empanelment of firms for purchase of three phase 4 wires whole current meters with MCB and without MDI OF REATING 20-60 Amps by consumers. |
U-04-2005.doc | Release of power connection to the tubewells under AP category | 04-2005.doc | Transfer of defaulting amount of consumers to permanent Defaulting ledgers. |
U-05-2005.doc | Regularization of "Reduction in load of Existing Industrial Consumers". | 05-2005.doc | Providing independent feeders for Lift irrigation System. |
U-06-2005.doc | Temporary empanelment of firms for purchase of three phase 4 wires whole current electronic energy meters of rating 10-40 Amps (with electromechanical counter) with MCB by consumers | 06-2005.doc | Temporary empanelment of firms for purchase of three phase 4 wire meters with MCB of rating 20-60 Amps by consumers. |
U-07-2005.doc | Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers | 07-2005.doc | Testing and sealing of meters. |
U-08-2005.doc | Conversion of feeding source from Rural to Urban feeder. | 08-2005.doc | Procedure for returning of defective electronic meters within warranty period to stores by the field offices. |
U-09-2005.doc | Interest on meter security deposit and staff security. | 09-2005.doc | Recovery of arrears for Defaulting Domestic, Non-domestic and Industrial Consumers under the Haryana Government Electrical Undertakings (Dues Recovery) Act, 1970. |
U-10-2005.doc | Shifting of the metering equipment of the consumer near the factory gate. | 10-2005.doc | Introduction of MT-2 Performa for joint checking of CT-PT meters. |
U-11-2005.doc | Voluntary Scheme for declaration of un-authorized loads - VDS - 2005. | 11-2005.doc | Tightening of Loose HT & LT lines/wires. |
U-12-2005.doc | Amendments to Instructions for dealing with the cases of Theft of Electricity under section-135 issued vide S.C. U-2 / 2005 & cases of Unauthorized use of Electricity under section-126 issued vide S.C. No. U-3 /2005 | 12-2005.doc | Replacement of existing three phase electromechanical meters with electronic meters. |
U-13-2005.doc | Levy of surcharge on Bulk Supply Consumers for exceeding the sanctioned load/contract demand | 13-2005.doc | Providing meter terminal cover and cover seals. |
U-14-2005.doc | Grant of more than one connections of NDS category in a premises- clubbing of loads | 14-2005.doc | Checking of consumer's premises. |
U-15-2005.doc | HERC Regulations on Electricity supply Code | 15-2005.doc | Voluntary scheme for declaration of un-authorized loads- VDS-2005. |
U-16-2005.doc | Voluntary Scheme for declaration of un-authorised load – VDS-2005. | 16-2005.doc | Arrears of Electricity Duty. |
U-17-2005.DOC | Voluntary Scheme for declaration of un-authorised load – VDS-2005. | 17-2005.doc | Guidelines for dealing with electrification Plan of Group Housing Society. |
U-18-2005.doc | Release of Power connection to the tubewells under general category. | 18-2005.doc | Provision of shunt Capacitors in respect of Agriculture Power Supply, LT Industrial (Small Power and medium supply), Public Water Works Supply & 33KV Sub Stations. |
U-19-2005.doc | Instructions for dealing an act of abetment for theft of electricity under Section-150 of the Electricity Act, 2003. | 19-2005.doc | Site checking of meters. |
U-20-2005.doc | Release of power connection to the tubewell under General category. | 20-2005.doc | Temporary empanelment of firms for purchase of 3 phase, 4wire whole current electronic meter with MDI of 10-60. A rating by consumers. |
U-21-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas. | 21-2005.doc | Recording of meter reading. |
U-22-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- First Clarification. | 22-2005.doc | Temporary empanelment of firms for purchase of 3 phase, 4wire whole current electronic meter with MCB and with/without MDI of rating 20-60 Amps. by consumers. |
U-23-2005.doc | Charging of domestic tariff instead of non-domestic tariff to elementary schools. | 23-2005.doc | Temporary empanelment of firms for purchase of 3 phase, 4 wire whole current electronic energy meter of rating 10-40 Amps (with electromechanical counter) with MCB by consumers. |
U-24-2005.doc | Voluntary Scheme for declaration of unauthorized load – VDS-2005. | 24-2005.doc | Temporary empanelment of firms for 3 phase 4 wires static LT CT meters Class 1.0 accuracy with MDI features. |
U-25-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Second Clarification. | 25-2005.doc | Provision of Augmentation of distribution transformer in the estimate. |
U-26-2005.doc | Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. | 26-2005.doc | Revision of permissible tolerance limits for the energy meters of class 1.0 / 0.5 accuracy. |
U-27-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Third Clarification. | 27-2005.doc | Release of Power connection to the tube wells under AP category. |
U-28-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Fourth Clarification. | 28-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas – Special Campaign for reconnection of disconnected Domestic Consumers. |
U-29-2005.doc | Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. | 29-2005.doc | Temporary empanelment of firms fro purchase of 3 phase, 4 wire whole current electronic energy meters of rating 10-40 Amps (with electromechanically counter) with MCB by consumers. |
U-30-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Fifth Clarification. | 30-2005.doc | Capacity of T/F commensurate with load installed by HT consumer. |
U-32-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- sixth Clarification. | 31-2005.doc | Method of Power line crossing of Railway Tracks. |
U-33-2005.doc | Shifting of the metering equipment of the consumer near the factory gate. | 32-2005.doc | Temporary empanelment of firms for 3 phase 4 wire static LT CT meters class-1 accuracy with MDI features. |
U-34-2005.doc | Temporary empanelment of firms for purchase of 3 phase, 4 wire whole current static meter with MDI of 10-60 A rating by consumers. | 33-2005.doc | i) Shifting of industrial load from rural to urban feeder. ii) Release of industrial connection from urban feeder instead of rural feeder whereas rural feeder is near to the premises of Industrial units. |
U-35-2005.doc | Release of power connection to the tubewells under general category- Priorities to various categories of consumers regarding. | 34-2005.doc | Settlement of pending Electricity Bills of rural Domestic and Agriculture category of consumer in rural area – Special Campaign for reconnection of disconnected domestic consumer. |
U-36-2005.doc | Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. | 35-2005.doc | No Demand Certificate to be issued by UHBVN regarding no dues with regard to payment of electricity are pending to the consumers (Agriculturist) for grant of exemption from payment of stamp duty on mortgage deed. |
U-37-2005.doc | Voluntary Disclosure Scheme for declaration of un-authorised loads of DS, NDS and Agriculture Power Consumers – VDS- 2005. | 36-2005.doc | Appeal to the Power consumers regarding meter and service cable. |
U-38-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Seventh Clarification. | 37-2005.doc | Construction of residences/other buildings beneath LT/HT lines. |
U-39-2005.doc | Release of power connection to tubewells used for fish farming – on priority. | 38-2005.doc | Guidelines for dealing with electrification plan of Group Housing Society |
U-40-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Eighth Clarification. | 39-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas – 17th Clarification. |
U-41-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Ninth Clarification on meter security in installments. | ||
U-42-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 10th Clarification. | ||
U-43-2005.doc | Discount of 10 paisa per unit in Domestic Tariff rates to women in case of properties are owned by women and the domestic electricity connection is in the name of that women on that property. | ||
U-44-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 11th Clarification. | ||
U-45-2005.doc | Interest on meter security deposit and staff security deposit. | ||
U-46-2005.doc | Effect of magnetic influence on electronic energy meters – instructions for dealing the cases of theft of energy – clarifications thereof. | ||
U-47-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 12th Clarification on meter security in installments. | ||
U-48-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 13th Clarification. | ||
U-49-2005.doc | Extension in time limit of the demand notices of Industrial applications. | ||
U-50-2005.doc | Theft of energy by LT Industrial consumer having load more than 35 KW and upto 70 KW. | ||
U-51-2005.DOC | Distribution of Electricity Bills in Rural Areas/Urban Areas. | ||
U-52-2005.doc | Scheme for out of court settlement of pending court cases. | ||
U-53-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 14th Clarification on Part payment. | ||
U-54-2005.doc | Directions for efficient use of energy and its conservation in the State of Haryana. | ||
U-55-2005.doc | Exemption from the levy of Electricity Duty on all persons generating energy for his own use for 5 years from 1st April, 2005 to 31st March, 2010. | ||
U-56-2005.doc | Release of Power Connection for Mega Projects, 100 percent EOUs and FDI Projects-On Priority. | ||
U-57-2005.doc | Penalty for un-authorised extension in load by NDS consumer- change of category from LT to HT – clarification thereof. | ||
U-58-2005.doc | Release of Power connection to the tubewells under AP category –Revival of cancelled AP applications who were defaulters in rural domestic category. | ||
U-59-2005.doc | Release of tubewell connection under General Category/Dedicated transformers.- Limiting L.T. line length. | ||
U-60-2005.doc | Advance Consumption Deposit (ACD) for the Industries having connected load more than 20 KW and monthly bill amount more than Rs.5000/- . | ||
U-61-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 15th Clarification. | ||
U-62-2005.doc | Amendment relating to competency of officers in the matter of sanction of load for new connections, extension of load in the case of existing connections and reduction in load. | ||
U-63-2005.doc | Independent feeder for Government Hospitals, Public Health-Water Works, Defence Services, Telephone Exchange, All India Radio, Railway and Educational Institutions having total connected load of 100 KW or more. | ||
U-64-2005.doc | Providing dedicated transformers to a Group of existing LT Agriculture Pumping category consumers. | ||
U-65-2005.doc | Release of Power connection to the tubewells under AP category. Revival of AP application- cancelled due to death of applicant. | ||
U-67-2005.doc | Release of power connection to the tubewells under AP category. | ||
U-68-2005.doc | Execution of HT works relating to provision of Independent feeder, conversion from rural supply to urban supply and release of new connections/ extension of load. | ||
U-69-2005.doc | HERC Regulations No. HERC/12/2005 on "Power to Require Security" under Section-47 of the Electricity Act-2003. | ||
U-70-2005.doc | Providing of 25/63KVA transformer by applicants for release of tubewell connections. | ||
U-71-2005.doc | Release of Power Connection to the tubewells under AP category. | ||
U-72-2005.doc | Scheme for out of court settlement of pending Court cases. | ||
U-73-2005.doc | HERC Regulations No. HERC/12/2005 on "Duty to Supply on Request" under Section-43 of the Electricity Act-2003. | ||
U-74-2005.doc | Railway Traction Tariff- Regarding SOP charges and imposition of incentive/penalty on account of Power factor – Clarification thereof. | ||
U-75-2005.doc | Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 16th Clarification. | ||
U-76-2005.DOC | Temporary empanelment of firms for purchase of single phase electronic meters(with electromagnetic counter) of rating 5-20 A/10-40 A with MCB. | ||
U-77-2005.doc | Advance consumption deposit (ACD) for the Industries having connected load more than 20 KW and monthly bill amount more than Rs. 5000/- viz-a-viz withdrawal of sales Circular No. U-60/2005. | ||
U-78-2005.doc | Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. | ||
U-79-2005.doc | Temporary empanelment of firms for purchase of single phase electronic meters (with electromagnetic counter) of rating 5-20A/10-40 A with MCB. | ||
U-80-2005.doc | Temporary empanelment of firms for purchase of 3 phase 4 wire electronic energy meters of rating 10-40 Amps (with electromechanical counter) MCB by consumers. |