Latest Tender Notices UHBVN

Archive: 2018 , 2017 , 2016

 

NIT No. Office Tender Description Date Downloads
NIT No. 81/CE/HPPC/LTP/Short Term Solar Dated 20.09.2019. Chief Engineer/HPPC, UHBVN, Panchkula. NIT for purchase of Short Term Solar Power for meeting the Solar Renewable Purchase Obligations. 15.10.2019 Download
EOI No. 82/CE/HPPC/LTP/100 MW Solar Dated 20.09.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Procurement of 100 MW flexible, schedulable RE Power for Long Term from RE based Grid Connected Solar & Wind/Small Hydro Power Projects. 13.11.2019 Download
Corrigendum-II to EOI No. 2/CE/C-2019. Executive Engineer/Comml, UHBVN, Panchkula. Amendment in Technical Criteria.   Download
Dropping of NIT No. 252/P&D/2019-20/Bid No. B-596. Chief Engineer/PD&C, UHBVN, Panchkula. Dropping of NIT.   Download
NIT No. 6/2019-20 Dated 16/09/2019. Superintending Engineer/Const Circle, UHBVN, Panchkula. To execute the work of Augmentation of 33 KV S/Stns & Erection/Augmentation of 33 KV Lines. 09/10/2019 Download
Dropping of NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Dropping of NIT.   Download
Corrigendum-IV to NIT No 24/XEN R-APDRP/SG-AMC/FMS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 24.09.2019 Download
NIT No. 274/P&D/2019 (Bid No. B-617). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Construction of 05 NO. New 33 KV S/Stns......... 10.10.2019 Download
Corrigendum-VII to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Time for Completion of Work Revised.   Download
Corrigendum IX to
NIT No. 238/XEN/R-II/2019 (Bid No-582). & NIT No. 239/XEN/R-II/2019 (Bid No-583).
Chief Engineer PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 03.10.2019 Download
NIT No. 03/UH/XEN/P-II/MM/QH-I/2540 Dated 10/09/2019. CE MM, UHBVN, Panchkula. Design, manufacture, supply, erection,commissioning and testing of BEE 5 Star Rated Submersible Pump Sets from 3 HP to 30 HP as per Nigam's specifications with 5 years warranty to be used for release of tube-well connections in the State of Haryana. 03/10/2019 Download
NIT No. 04/UH/MM-I/QH-I/2541 Dated 14/09/2019. CE MM, UHBVN, Panchkula. Whole current AC Single phase two wire DLMS compliant static energy meter(10-60A) of accuracy class 1.0 with communication facility with self locking type polycarbonate meter box conforming to Nigam's technical specification no. CSC-47/Rev-VII/DH/UH/ P&D /2017-18 with latest amendments and as per relevant ISS thereof. 09/10/2019 Download
NIT No. 07/UH/MM/XEN/P-III/MM (QH-II-2023) Dated 14.09.2019. Superintending Engineer/MM, For CE MM, UHBVN, Panchkula. Supply of Instllation & Commissioning of 1336 Nos (12V, 65AH) SMF Batteries for KVA & 2 KVA UPS......... 09.10.2019 Download
NIT No. 273/UH/JICA/AMB/2019-20 B-616 Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Bifurcation/Trifucation of overhead 11 KV feeders with 80......... 15.10.2019 Download
Corrigendum-IV to NIT No. 268/P&D/2019 (B-611). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 26.09.2019 Download
Corrigendum-IV to NIT No. 266/P&D/2019 (B-609). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 26.09.2019 Download
Corrigendum-V to NIT No. 264/P&D/2019 (B-607). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 26.09.2019 Download
EOI No. 2/CE/C-2019 Chief Engineer/P&D, UHBVN, Panchkula. Empanelment of Agencies for Supply, Installation, Testing & Commissioning including warranty, Spare parts and Coprehensive Maintenance of 1KWP to 500KWP Grid Connected Rooftop Solar.........   Download
NIT No. 272/P&D/2019 Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning/ Construction of 01 No. 33/11 KV containerized GIS S/Stn......... 03.10.2019 Download
NIT No. 271/P&D/2019 Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning/ Construction of 01 No. 33/11 KV containerized GIS S/Stn......... 03.10.2019 Download
Corrigendum-I to NIT No 26/IPDS/SI/ERP/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 30.09.2019 Download
Corrigendum-IV to NIT No. 258/UH/JICA/PNP/2019-20. (Bid No. B-602) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 30.09.2019 Download
Corrigendum-IV to NIT No. 256/UH/JICA/KNL/2019-20. (Bid No. B-600) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 30.09.2019 Download
Corrigendum-VI to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 30.09.2019 Download
NIT No. 6/SK-1/2019-2020 Dated 10.09.2019. Executive Engineer, S/U No. 1 UHBVN, Karnal. Hiring of 2 Vehicle. 24.09.2019 Download
Corrigendum to NIT No. 08/"OP"/Assandh/19-20. Executive Engineer, OP UHBVN, Assandh. Hiring of Vehicle. 25.09.2019 Download
Dropping of NIT No 251/P&D/2019-20. (B-595) Chief Engineer/PD&C, UHBVN, Panchkula. Dropping of NIT No 251/P&D/2019-20. (B-595)   Download
Dropping of NIT No. 234/P&D/2019/Bid No. B-578. Chief Engineer/P&D, UHBVN, Panchkula. Dropping of NIT No. 234/P&D/2019/Bid No. B-578.   Download
NIT No. 3/M&P/Rohtak/2019-20 Dated: 06.09.2019 Executive Engineer, M & P UHBVN, Rohtak. Hiring of Jeep. 24.09.2019 Download
NIT No. 5/OP City Divn.Rtk/2019-20 Dated: 03.09.2019 Executive Engineer, UHBVN, Rohtak. Hiring of Jeep. 13.09.2019 Download
NIT No. 4/OP City Divn.Rtk/2019-20 Dated: 03.09.2019. Executive Engineer, UHBVN, Rohtak. Hiring of Jeep. 13.09.2019 Download
Corrigendum-III to NIT No. 263/UH/JICA/YNR/2019-20 & Bid No. B-606 . Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 24.09.2019 Download
Corrigendum-IV to NIT No. 259/P&D/2019 (B-603). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 03.09.2019 Download
Dropping of NIT No 250/P&D/2019-20. (B-594) Chief Engineer/PD&C, UHBVN, Panchkula. Dropping of NIT No 250/P&D/2019-20. (B-594)   Download
Memo No Ch-04/NIT-06/OP/Assandh Dated 21.08.2019. Executive Engineer/OP, UHBVN Assandh. Publishing of corrigendum invitation for Hiring 1No. Vehicle (Jeep with hard top i.e. Bolero/Sumo) for XEN "OP" Divn., UHBVN, Assandh..   Download
Corrigendum-III to NIT No 24/XEN R-APDRP/SG-AMC/FMS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 14.09.2019 Download
Corrigendum-VI to NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Chief Technology Officer, UHBVN Panchkula. Amendment in the GCC Clause No. 2.   Download
Memo No Ch-01/NIT-08/OP/Assandh Dated 02.08.2019. Executive Engineer/OP, UHBVN Assandh. Hiring of Vehicle. 05.09.2019 Download
Corrigendum-III to NIT No. 258/UH/JICA/PNP/2019-20. (Bid No. B-602) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 11.09.2019 Download
Corrigendum-III to NIT No. 257/UH/JICA/KKR/2019-20. (Bid No. B-601) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 11.09.2019 Download
Corrigendum-III to NIT No. 256/UH/JICA/KNL/2019-20. (Bid No. B-600) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 11.09.2019 Download
Corrigendum-V to NIT No 247/P&D/2019-20. (Bid No. B-591) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 04.09.2019 Download
Corrigendum-V to NIT No. 245/P&D/2019-20 (Bid No. B-589). Chief Engineer/P&D, UHBVN, Panchkula. Bifurcation/trifurcation of overloaded feeders, Augmentation of conductor of HT line and New DT, under Operation Circle UHBVN, Karnal on turnkey basisOpening date: 19.08.2019. 04.09.2019 Download
Corrigendum-V to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 04.09.2019 Download
Corrigendum to NIT No. 04/CE/Comml/RA/CS/2019-20 Dated 06.08.2019. Chief Engineer/Comml, UHBVN, Panchkula. Extension of Last Date of Submission. 16.09.2019 Download
Corrigendum VII to NIT No. 238/XEN/R-II/2019 (Bid No-582). &
NIT No. 239/XEN/R-II/2019 (Bid No-583).
Chief Engineer PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 04.09.2019 Download
Corrigendum-II to NIT No. 263/UH/JICA/YNR/2019-20 (B-606). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 02.09.2019 Download
NIT No. 80/HPPC Dated 29.07.2019. Chief Engineer/HPPC, UHBVN, Panchkula. For banking of Short Term Power from Nov-2019 to Sept-2020 29.08.2019 Download
NIT No 26/IPDS/SI/ERP/2019. Chief Technology Officer, UHBVN Panchkula. Engagement of System Integrator (SI) for ERP Project implementation in UHBVN & DHBVN. 09.09.2019 Download
Corrigendum-V NIT No 251/P&D/2019-20. (B-595) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 27.08.2019 Download
Corrigendum-I to NIT No. 269/P&D/2019 (B-612). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-I to NIT No. 268/P&D/2019 (B-611). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-I to NIT No. 267/P&D/2019 (B-610). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-I to NIT No. 266/P&D/2019 (B-609). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-II to NIT No. 264/P&D/2019 (B-607). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-II to NIT No. 259/P&D/2019 (B-603). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 21.08.2019 Download
Corrigendum-V NIT No 252/P&D/2019-20. (Bid No. B-596). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 27.08.2019 Download
Corrigendum-V to NIT No 250/P&D/2019-20. (B-594) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 27.08.2019 Download
Corrigendum-V to NIT No. 249/P&D/2019-20 (Bid No. B-593). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 27.08.2019 Download
Corrigendum-V to NIT No. 246/P&D/2019-20 (Bid No. B-590). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 27.08.2019 Download
Corrigendum-II to NIT No 24/XEN R-APDRP/SG-AMC/FMS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 26.08.2019 Download
NIT-33/Amb-2018-19 Dated 07.08.2019. Superintending Engineer/OP, UHBVN, Ambala. Electrical Works upto 11 KV. 21.08.2019 Download
Corrigendum-I to NIT No. 79/CE/HPPC/LTP/Short tem solar Dated 29.07.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Extension of Last Date of Submission. 19.08.2019 Download
Corrigendum-II to NIT No. 258/UH/JICA/PNP/2019-20. (Bid No. B-602) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 26.08.2019 Download
Corrigendum-II to NIT No. 257/UH/JICA/KKR/2019-20. (Bid No. B-601) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 26.08.2019 Download
Corrigendum-II to NIT No. 256/UH/JICA/KNL/2019-20. (Bid No. B-600) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 26.08.2019 Download
Corrigendum-V to NIT No. 245/P&D/2019-20 (Bid No. B-589). Chief Engineer/P&D, UHBVN, Panchkula. Bifurcation/trifurcation of overloaded feeders, Augmentation of conductor of HT line and New DT, under Operation Circle UHBVN, Karnal on turnkey basisOpening date: 19.08.2019.   Download
NIT No. 06/UH/MM/XEN/P-III (QH-II/2022) Dated 05.08.2019. Superintending Engineer/P-II/MM, UHBVN, Panchkula. Twin Core LT PVC 10 sq. mm Cables (Un-Armoured). 26.08.2019 Download
NIT No. 05/UH/MM/XEN/P-III (QH-II/2021) Dated 05.08.2019. Superintending Engineer/P-II/MM, UHBVN, Panchkula. Twin Core LT PVC 10 sq. mm Cables (Armoured). 26.08.2019 Download
NIT No. 04/CE/Comml/RA/CS/2019-20 Dated 06.08.2019. Chief Engineer/Comml, UHBVN, Panchkula. Filing of MYT Petition/other Regulatory works, Various Operations & Functions. 26.08.2019 Download
Corrigendum-I to NIT No. 264/P&D/2019 (B-607). Chief Engineer/PD&C, UHBVN, Panchkula. Change in the Estimated Cost.   Download
Corrigendum-IV to NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 16.08.2019 Download
Tender No. WS-1036 Tender ID. 2019_HBC_89564 Dated 29.07.2019. Superintending Engineer/P&D, UHBVN, Panchkula. Repairing of Damaged Distribution Transformers of Rating 25, 63 & 100 KVA in DHBVN.... 19.08.2019 Download
NIT No. 270/P&D/2019 (Bid No. B-613). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Construction of 03 No. existing 33 KV S/Stn........ 22.08.2019 Download
Dropping of NIT No. 248/B-592/D-II. Superintending Engineer/P&D, UHBVN, Panchkula. Dropping of NIT.   Download
Corrigendum-I to NIT No. 263/UH/JICA/YNR/2019-20 (B-606). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 19.08.2019 Download
Corrigendum-IV to NIT No 247/P&D/2019-20. (Bid No. B-591) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 19.08.2019 Download
Corrigendum-IV to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 19.08.2019 Download
Corrigendum-I to NIT No 24/XEN R-APDRP/SG-AMC/FMS/2019. Executive Engineer/R-APDRP, UHBVN Panchkula. Extension of Last Date of Submission. 13.08.2019 Download
NIT No. 79/CE/HPPC/LPT/Short Term Solar 29.07.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Procurement of 300 MW Solar Power on short term on DEEP Portal through PFFCL. 07.08.2019 Download
NIT- 6/Vig/KNL/2019-20 Dated 22.07.2019 Executive Engineer, Vigilance HPUs Karnal. Hiring of 1. No. Jeep. 13.08.2019 Download
Corrigendum-I to NIT No. 262/P&D/2019 (B-605). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 05.08.2019 Download
Corrigendum-I to NIT No. 261/P&D/2019 (B-604). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 05.08.2019 Download
NIT No. 269/P&D/2019 (B-612). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV S/Stn....... 09.08.2019 Download
NIT No. 268/P&D/2019 (B-611). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV S/Stn....... 09.08.2019 Download
NIT No. 267/P&D/2019 (B-610). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV S/Stn....... 09.08.2019 Download
NIT No. 266/P&D/2019 (B-609). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV S/Stn....... 09.08.2019 Download
NIT No. 265/P&D/2019 (B-608). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV S/Stn....... 09.08.2019 Download
NIT No. 264/P&D/2019 (B-607). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Augmentation of 02 No. existing 33 KV  S/Stn....... 09.08.2019 Download
Corrigendum-I to NIT No. 259/P&D/2019 (B-603). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 09.08.2019 Download
NIT No 5/2019-20. Dated 19.07.2019 Superintending Engineer/CONST. Circle, UHBVN Panchkula. Supply of Un-skilled & Skilled Labour for 33 KV S/Stns........... 08.08.2019 Download
NIT-1/FA/HQ/UH/2019-20 Dated 24.06.2019. Sr. Accounts Officer/Admn., UBVNL, Panchkula. 1 No. Car. 29.07.2019 Download
Corrigendum-IV NIT No 251/P&D/2019-20. (B-595) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.08.2019 Download
Corrigendum-IV to NIT No 250/P&D/2019-20. (B-594) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.08.2019 Download
Corrigendum-IV to NIT No. 246/P&D/2019-20 (Bid No. B-590). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 08.08.2019 Download
Corrigendum-I to NIT No. 258/UH/JICA/PNP/2019-20. (Bid No. B-602) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 07.08.2019 Download
Corrigendum-I to NIT No. 257/UH/JICA/KKR/2019-20. (Bid No. B-601) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 07.08.2019 Download
Corrigendum-I to NIT No. 256/UH/JICA/KNL/2019-20. (Bid No. B-600) Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 07.08.2019 Download
Corrigendum-IV NIT No 252/P&D/2019-20. (Bid No. B-596). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.08.2019 Download
Corrigendum-IV to NIT No. 249/P&D/2019-20 (Bid No. B-593). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.08.2019 Download
NIT No. 231/UH/XEN/P-II/MM/QST-I/2535 Dated 25/01/19. Superintending Engineer/P-I, UHBVN, Panchkula. Dropping of NIT.   Download
NIT No. 3/2018-19. Executive Engineer Civil Const. UHBVN, Panchkula. Hiring of One No. Jeep. 29.07.2019 Download
NIT No. 11/Vig/2019-20. Dated: 18.07.19 Executive Engineer Vigilance HPUs, Ambala. Hiring of One No. Jeep. 02.08.2019 Download
Corrigendum-IV to NIT No. 245/P&D/2019-20 (Bid No. B-589). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 01.08.2019 Download
NIT No 1/FA/HQ/UH/2019-20 Dated 24/06/19 Accounts Officer/Admn., UHBVN Panchkula. 1 No. Car. 23.07.2019 Download
Corrigendum-III to NIT No 247/P&D/2019-20. (Bid No. B-591) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 25.07.2019 Download
Corrigendum-III to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 25.07.2019 Download
Corrigendum-6 to NIT No. 77/CE/HPPC/Solar/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Amendment in the Clause of RfP. 05.08.2019 Download
Corrigendum VI to NIT No. 238/XEN/R-II/2019 (Bid No-582). &
NIT No. 239/XEN/R-II/2019 (Bid No-583).
Chief Engineer PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 29.07.2019 Download
NIT No. E-1/Store/Rohtak/(2019-20). Executive Engineer C/S. UHBVN, Rohtak. Hiring of One No. Jeep. 29.07.2019 Download
NIT No 04/UH/MM/XEN/P-III/MM. Dated 11.07.2019 Superintending Engineer/P-II/MM, UHBVN Panchkula. LT XLPE Armoured Cable of Size SCX25. 05.08.2019 Download
NIT No 03/UH/MM/XEN/P-III/MM. Dated 11.07.2019 Superintending Engineer/P-II/MM, UHBVN Panchkula. LT XLPE Armoured Cable of Size SCX50. 05.08.2019 Download
NIT No 04/2019-20. Dated 11.07.2019 Superintending Engineer/CONST. Circle, UHBVN Panchkula. Transportation & Loading/un-Loading of 33/11 KV Power T/F........ 30.07.2019 Download
Corrigendum-II to NIT No 02/UH/MM/XEN/MM/P-IV/QH-II/2018. Dated 13.06.2019 Superintending Engineer/P-II/MM, UHBVN Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
Corrigendum-II to NIT No 01/UH/MM/XEN/MM/P-IV/QH-II/2017. Dated 13.06.2019 Superintending Engineer/P-II/MM, UHBVN Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
Corrigendum-III to NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
NIT No 01/2019/UH/CAO-CAC Dated 08/07/19 Chief Accounts Officer, UHBVN Panchkula. For Cash in Transit, Cash in Safe, Cash at Counter for period of one year. 25.07.2019 Download
Corrigendum to NIT No 25/XEN R_APDRP/AMC/DMS/2019-20. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
NIT No. 2/2018-19. Executive Engineer Civil Const. Divn., UHBVN, Panchkula. Hiring of One No. Car. 18.07.2019 Download
NIT No. 1/2019-20 (Bid No. B-593). Executive Engineer S/U Divn. No. 2, UHBVN, Rohtak. One No Outsourced Vehicle. 22.07.2019 Download
Corrigendum to NIT No. 249/P&D/2019-20 (Bid No. B-593). Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
EOI No. 260/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Empanelment for Electrical Contractors for Supply, Installation, Testing & Commissioning of 11 KV Lines....... 25.07.2019 Download
E-8/XENVIG/Rohtak/2019-20. Executive Engineer/Vigilance, HPUs, Rohtak. Hiring of 1 No. Vehicle..... 19.07.2019 Download
Corrigendum-III NIT No 252/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 18.07.2019 Download
NIT No. 263/P&D/2019 (B-606). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Bifurcation/trifurcation of 41 No. 11 KV feeders....... 29.07.2019 Download
EOI No. 05/KNL/SU-II/2019-20. Executive Engineer, S/U Divn. No. 1, UHBVN Karnal. For Cleaning & Sweeping activity..... 17.07.2019 Download
NIT No. 262/P&D/2019 (B-605). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning of 01 No. 33/11 KV containerzed GIS Sub Station....... 26.07.2019 Download
NIT No. 261/P&D/2019 (B-604). Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning of 01 No. 33/11 KV containerzed GIS Sub Station....... 26.07.2019 Download
NIT No. 5/SK-1/2019-2020. Executive Engineer, S/U Divn. No. 1, UHBVN Karnal. Hiring of 1 No. Jeep. 08.07.2019 Download
Corrigendum-III to NIT No. 248/P&D/2019-20 (Bid No. B-592). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 16.07.2019 Download
Corrigendum-III to NIT No. 246/P&D/2019-20 (Bid No. B-590). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 16.07.2019 Download
Corrigendum-III to NIT No. 245/P&D/2019-20 (Bid No. B-589). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 16.07.2019 Download
NIT No. 03/CCR/2019-20 Dated 14.06.2019. Executive Engineer, S/U Divn. No. 1, UHBVN Karnal. Hiring of 1 No. Jeep. 08.07.2019 Download
NIT No WS-1035 dated 27.06.2019. SE/Stores & Workshops, UHBVN Dhulkote. For Insurance of Combustible Moveable Stock Inventory lying in Stores & Workshop in UHBVN. 15.07.2019 Download
NIT No. 259/P&D/2019 (B-603). Chief Engineer/PD&C, UHBVN, Panchkula. Construction of 08 No New 33 KV S/Stn....... 18.07.2019 Download
NIT No. 258/UH/JICA/PNP/2019-20. Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Bifurcation /Trification of 37....... 22.07.2019 Download
NIT No. 257/UH/JICA/KKR/2019-20. Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Bifurcation /Trification of 42....... 22.07.2019 Download
NIT No. 256/UH/JICA/KNL/2019-20. Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection, Testing & Commissioning for Bifurcation /Trification of 58....... 22.07.2019 Download
Corrigendum to NIT No. 03/CCR/2019-20 Dated 14.06.2019. Executive Engineer, Civil Construction Divn. UHBVN Rohtak. Extension of Last Date of Submission. 11.07.2019 Download
NIT No. 04/CCR/2019-20 Dated 26.06.2019. Executive Engineer, Civil Construction Divn. UHBVN Rohtak. Providing Aluminium Partition and fall Ceiling for SDO & Staff at 33 KV S/Stn. 11.07.2019 Download
Corrigendum to NIT No. 10/SEOPKTL/2019-20 Dated 13.06.2019. Superintending Engineer, UHBVN Kaithal. EMD Rs. 1.00 Lacs.   Download
NIT No. 02/UH/XEN/P-II/MM/QST-I/2539 Dated 25.06.2019. Superintending Engineer/P-I, UHBVN, Panchkula. Design, Manufacture, Supply, Erection, Commissioning and Testing of BEE 5 Star....... 08.07.2019 Download
Corrigendum-II to NIT No 247/P&D/2019-20. (Bid No. B-591) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.07.2019 Download
Corrigendum-II to NIT No 244/P&D/2019-20. (Bid No. B-588) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 08.07.2019 Download
NIT No. 02/XEN/SU-II/2019-20 Dated 10.06.2019. Executive Engineer, SU-II Div. No. 2. UHBVN Karnal. Hiring one vehicle. 11.07.2019 Download
NIT-1/FA/HQ/UH/2019-20 Dated 24.06.2019. Sr. Accounts Officer/Admn., UBVNL, Panchkula. 1 No. Car. 09.07.2019 Download
05/"OP"/Assandh/19-20. Executive Engineer, OP Divn. UHBVN Assandh. Hiring one vehicle. 05.07.2019 Download
NIT No. 04/XEN/SU-II/2019-20 Dated 21.06.2019 Executive Engineer, SU Divn. No 2 UHBVN Karnal. 1. No. Mahindra/TATA Force/any other Jeep. 04.07.2019 Download
Corrigendum-I to NIT No. 1/M&P/2019-20/ Dated 30.05.2019 Executive Engineer, M&P Divn. UHBVN Ambala. Extension of Last Date of Submission. 28.06.2019 Download
08/04/Assandh/18-19. Executive Engineer, OP Divn. UHBVN Assandh. Hiring one vehicle. 05.07.2019 Download
Corrigendum to NIT No 1/M&P/2019-20 Dated 30/05/19. Executive Engineer, M&P Divn. UHBVN Ambala. Extension of Last Date of Submission. 28.06.2019 Download
NIT No. 03/2019-20 Dated 20.06.2019. Superintending Engineer Contruction Circle, UHBVN, Panchkula. Transportation & Loading/Un-Loading of 33/11 KV Power T/F....... 10.07.2019 Download
NIT No. 01/UH/MM/XEN/MM/QH-I/2538 Dated 19.06.2019. Superintending Engineer/P-I (MM), UHBVN, Panchkula. Male & Female contacts for 11 KV 400 Amp. G.O. Switch....... 10.07.2019 Download
Corrigendum-II NIT No 251/P&D/2019-20. (B-595) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 04.07.2019 Download
Corrigendum-I to NIT No 250/P&D/2019-20. (B-594) Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 04.07.2019 Download
Corrigendum to NIT No 01/XEN/SU-II/2019-20 Dated 29/05/2019. Executive Engineer, S/U Divn. NO. II UHBVN Karnal. Extension of Last Date of Submission. 21.06.2019 Download
NIT No 23/XEN Projects/AMI/2019. Chief Technology Officer, UHBVN Panchkula. Engagement of Agency for Supply, IMplementation and Maintenance of Smart Meters and AMI System for Consumers. 19.07.2019 Download
NIT No. 01/XEN/MM/XEN/MM/P-IV/QH-II/2017 Dated 13.06.2019. Superintending Engineer/P-II, UHBVN, Panchkula. GSS Wire 7/8 SWG (4mm). 08.07.2019 Download
NIT No. 02/UH/MM/XEN/MM/P-IV/QH-II/2018 Dated 13.06.2019. Superintending Engineer/P-II, UHBVN, Panchkula. GI Wire 8 SWG (4mm). 08.07.2019 Download
NIT No 25/XEN R-APDRP/AMC/DMS/2019-20. Chief Technology Officer, UHBVN Panchkula. Appointment of an Agency for undertaking the AMC of New Gen DMS and Radware Link Load Balancer. 08.07.2019 Download
NIT No 24/XEN R-APDRP/SG-AMC/FMS/2019. Chief Technology Officer, UHBVN Panchkula. Appointment of an Agency for undertaking the AMC/FMS of IT Infra/Software Application. 08.07.2019 Download
NIT No. 254/P&D/2019 (Bid No. B-598). Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning for Augmentation of 16 No. existing 33 KV sub stations....... 08.07.2019 Download
Corrigendum-II to NIT No. 252/P&D/2019-20 (Bid No. B-596). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 01.07.2019 Download
Corrigendum-II to NIT No. 249/P&D/2019-20 (Bid No. B-593). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 01.07.2019 Download
NIT No. 9/SEOPKTL/2019-20 Dated 28.05.2019. Superintending Engineer/OP, UHBVN, Kaithal. While taking the process of online publish of e-tender on portal of next-tender, it has been confirmed from nexttender, chandigarh that the contract of next tender, chandigarh that the contract of next tender with Haryana Govt was over..........   Download
Corrigendum-II to NIT No. 248/P&D/2019-20 (Bid No. B-592). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 27.06.2019 Download
Corrigendum-II to NIT No. 246/P&D/2019-20 (Bid No. B-590). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 27.06.2019 Download
Corrigendum-II to NIT No. 245/P&D/2019-20 (Bid No. B-589). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 27.06.2019 Download
NIT No. 255/P&D/2019 (Bid No. B-599). Chief Engineer/P&D, UHBVN, Panchkula. Release of Tubewell Connections. 03.07.2019 Download
Corrigendum-II to NIT No. 246/P&D/2019-20 (Bid No. B-590). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 27.06.2019 Download
Corrigendum-I to NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Chief Technology Officer, UHBVN Panchkula. Extension of Last Date of Submission. 21.06.2019 Download
Corrigendum-I to NIT No 247/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 24.06.2019 Download
Corrigendum-I to NIT No 244/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 24.06.2019 Download
Dropping of NIT No. 222/P&D/Zone-II/2018-19/Bid No. B-566. Superintending Engineer/P&D, UHBVN, Panchkula. Dropping of NIT No. 222/P&D/Zone-II/2018-19/Bid No. B-566.   Download
Dropping of NIT No. 221/P&D/Zone-I/2018-19/Bid No. B-565. Superintending Engineer/P&D, UHBVN, Panchkula. Dropping of NIT No. 221/P&D/Zone-I/2018-19/Bid No. B-565.   Download
Dropping of NIT No. 220/JICA/RTK/B-564/DD-II Package No. 28. Superintending Engineer/P&D, UHBVN, Panchkula. Dropping of NIT No. 220/JICA/RTK/B-564/DD-II Package No. 28.   Download
NIT No 18/SEOPKTL/2019-20. Superintending Engineer, OP UHBVN, Kaithal. Erection of Independent Feeders, System Improvement Works................ 20.06.2019 Download
Corrigendum to NIT No 13/CCR/2019-20 Dated 05/02/19. Executive Engineer, Civil Const. Divn. UHBVN Rohtak. Extension of Last Date of Submission. 14.06.2019 Download
NIT No 01/CCR/2019-20 Dated 03/06/19. Executive Engineer, M&P Divn. UHBVN Rohtak. Contruction of various equipment foundation at 33 KV S/Stn. 14.06.2019 Download
Dropping of NIT No. 228/UH/XEN/P-IV/MM Dated 31.10.2018. Superintending Engineer/P-II, UHBVN, Panchkula. Dropping of NIT No. 228/UH/XEN/P-IV/MM Dated 31.10.2018.   Download
Dropping of NIT No. 227/UH/XEN/P-IV/MM Dated 27.09.2018. Superintending Engineer/P-I, UHBVN, Panchkula. Dropping of NIT No. 227/UH/XEN/P-IV/MM Dated 27.09.2018.   Download
Corrigendum-I NIT No 251/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 18.06.2019 Download
NIT No 250/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 18.06.2019 Download
NIT No 1/M&P/2019-20 Dated 30/05/19. Executive Engineer, M&P Divn. UHBVN Ambala. Hiring of 2 Nos. Jeep. 21.06.2019 Download
Corrigendum-I to NIT No. 252/P&D/2019 (Bid No. B-596). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 13.06.2019 Download
Corrigendum-I to NIT No. 249/P&D/2019 (Bid No. B-593). Chief Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 13.06.2019 Download
NIT No 9/SEOPKTL/2019-20. Superintending Engineer, OP UHBVN, Kaithal. E-Tender for operating Bijli Suvidha Kendra (BSK) at Kaithal City. 13.06.2019 Download
Dropping of NIT No 222/P&D/Zone-I/2018-19/Bid No. B-566. Chief Engineer/MM, UHBVN, Panchkula. Dropping of NIT No 222/P&D/Zone-I/2018-19/Bid No. B-566.   Download
NIT No 1/M&P/2019-20 Dated 27/05/19. Executive Engineer, M&P Divn. UHBVN Rohtak. Jeep (Bolero) requirement of 2 Nos. vehicles. 27.05.2019 Download
Corrigendum-I to NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Executive Eningeer/RAPDRP, UHBVN Panchkula. Amendments made in the Qualifying Technical Criteria.   Download
NIT No. E-1/M&P/Rohtak/2019-20 (Bid No. B-592) Dated 27.05.2019. Executive Engineer/M&P, UHBVN, Rohtak. Hiring of 2 No. Jeep. 11.06.2019 Download
Corrigendum-I to NIT No. 248/P&D/2019 (Bid No. B-592). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
Corrigendum-I to NIT No. 246/P&D/2019 (Bid No. B-590). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
Corrigendum-I to NIT No. 245/P&D/2019 (Bid No. B-589). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
NIT No. E-1/M&P/Rohtak/2019-20 (Bid No. B-592) Dated 27.05.2019. Executive Engineer/M&P, UHBVN, Rohtak. Hiring of 2 No. Jeep. 11.06.2019 Download
Corrigendum-I to NIT No. 248/P&D/2019 (Bid No. B-592). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
Corrigendum-I to NIT No. 246/P&D/2019 (Bid No. B-590). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
Corrigendum-I to NIT No. 245/P&D/2019 (Bid No. B-589). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 10.06.2019 Download
NIT No 01/OP City Divn. Rohtak 2019-20 Dated 24.05.2019. Executive Engineer/OP City, UHBVN, Rohtak. Hiring of Jeep open from back side. 03.06.2019 Download
Corrigendum-V to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Extension of Last Date of Submission. 11.06.2019 Download
Corrigendum-I to NIT No. 243/P&D/2019 (Bid No. B-587). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 03.06.2019 Download
Corrigendum-I to NIT No. 242/P&D/2019 (Bid No. B-586). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 03.06.2019 Download
Corrigendum-I to NIT No. 241/P&D/2019 (Bid No. B-585). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 06.06.2019 Download
Corrigendum-I to NIT No. 240/P&D/2019 (Bid No. B-584). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 06.06.2019 Download
NIT No. 253/P&D/2019. Chief Engineer/P&D, UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning/Construction of 2 No. 33/11 KV containerized GIS Sub Stations........... 11.06.2019 Download
Corrigendum-VI to NIT No. 232/P&D/2019 (Bid No. B-576). Superintending Engineer/P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 23.05.2019 Download
NIT No 247/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines...... under OP Circle UHBVN, Kaithal. 03.06.2019 Download
NIT No 244/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines...... under OP Circle UHBVN, Ambala. 03.06.2019 Download
NIT No 11/Vig./2019-20. Dated 08.05.2019. XEN/Vigilance, HPUs, Ambala. Hiring of 1 No. Bolero Jeep. 23.05.2019 Download
NIT No 251/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines...... under OP Circle UHBVN, Rohtak. 30.05.2019 Download
NIT No 250/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines...... under OP Circle UHBVN, Sonepat. 30.05.2019 Download
Corrigendum-IV to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Extension of Last Date of Submission. 20.05.2019 Download
NIT No. 252/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines....... under OP Circle UHBVN, Jhajjar. 28.05.2019 Download
NIT No. 249/P&D/2019-20. Chief Engineer/PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines...... under OP Circle UHBVN, Panipat. 28.05.2019 Download
Corrigendum-V to NIT No. 246/UH/MM/XEN/P-III Dated 22.02.2019. Superintending Engineer/P-II/MM, UHBVN, Panchkula. Extension of Last Date of Submission. 03.05.2019 Download
Corrigendum-V to NIT No. 245/UH/MM/XEN/P-III Dated 01.02.2019. Superintending Engineer/P-II/MM, UHBVN, Panchkula. Extension of Last Date of Submission. 03.05.2019 Download
NIT No. 253/UH/MM/XEN/P-III/MM/QH-II/2014 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. Procurement of LT PVC Cable of 4CX50 sq. mm. 15.05.2019 Download
NIT No. 252/XEN/P-III/MM/QH-II/2015 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. Procurement of LT PVC Cable (Unmoured) of 4CX25 sq. mm. 15.05.2019 Download
NIT No. 251/XEN/P-III/MM/QH-II/2014 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. Procurement of LT PVC Cable of 4CX16 sq. mm. 15.05.2019 Download
NIT No. 250/UH/MM/XEN/P-III/MM/QST-II/2013 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. Procurement of LT XLPE Armoured Cable of size SCX120 sq. mm. 06.05.2019 Download
NIT No. 248/P&D/2019-20. Chief Engineer PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines with bifurcation/trifurcation of overload feeders, augmentation of conductor of HT line & new DT under Circle UHBVN, YMN. 24.05.2019 Download
NIT No. 246/P&D/2019-20. Chief Engineer PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines with bifurcation/trifurcation of overload feeders, augmentation of conductor of HT line & new DT under Circle UHBVN, KKR. 24.05.2019 Download
NIT No. 245/P&D/2019-20. Chief Engineer PD&C, UHBVN, Panchkula. System strengthening of 11 KV lines with bifurcation/trifurcation of overload feeders, augmentation of conductor of HT line & new DT under Circle UHBVN, Karnal. 23.05.2019 Download
NIT No 22/IPDS/IT Phase-II/RT-DAS/2019. Chief Technology Officer, UHBVN Panchkula. Appointment of agency for implementing the Real Time Data Acquisition System (RT-DAS) solution in UHBVN & DHBVN. 20.05.2019 Download
Corrigendum to NIT No WS-1034 dated 08.03.2019. SE/Stores & Workshops, UHBVN Dhulkote. Extension of Last Date of Submission. 17.05.2019 Download
NIT No. 239/XEN/R-II/2019 (Bid No-583). Chief Engineer PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 15.05.2019 Download
Corrigendum-I to NIT No. 238/XEN/R-II/2019 (Bid No-582). Chief Engineer PD&C, UHBVN, Panchkula. Extension of Last Date of Submission. 15.05.2019 Download
Corrigendum-III to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Corrigendum-III to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. 02.05.2019 Download
Corrigendum-V to NIT No. 236/P&D/2019 (Bid-580). Superintending Engineer P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 02.05.2019 Download
Corrigendum-V to NIT No. 235/P&D/2019 (Bid-579). Superintending Engineer P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 02.05.2019 Download
Corrigendum-V to NIT No. 232/P&D/2019 (Bid No. B-576). Superintending Engineer/P-II (MM), UHBVN, Panchkula. Extension of Last Date of Submission. 02.05.2019 Download
Corrigendum-II to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Corrigendum-II to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. 08.03.2019 Download
NIT No 3/SU-1/RTK/2018-19. Executive Engineer S/U Divn. No. 1, UHBVN, Rohtak. Supply of 1 no vehicle (Mahindra Bolero Camper). 25.03.2019 Download
Corrigendum-5 to NIT No. 77/CE/HPPC/Solar/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Extension of Last Date of Submission. 22.04.2019 Download
Corrigendum to NIT No 35/CCR/2018-19 Dated 18.02.2018. Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Extension of Last Date of Submission/Opening. 28.05.2019 Download
Corrigendum to NIT No. 78. Chief Engineer/HPPC, UHBVN, Panchkula. Extension of Last Date of Submission. 25.03.2019 Download
NIT No. 233/UH/MM/XEN/P-I/MM/QH-I/2537 Dated: 08.03.2019. Superintending Engineer P-I (MM), UHBVN, Panchkula. 11 KV VCB Panels (I/C, O/G, C/C Stn./Tfr or 8 Panel Boards). 01.04.2019 Download
Corrigendum-IV to NIT No. 236/P&D/2019 (Bid-580). Superintending Engineer P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 18.03.2019 Download
Corrigendum-IV to NIT No. 235/P&D/2019 (Bid-579). Superintending Engineer P&D, UHBVN, Panchkula. Extension of Last Date of Submission. 18.03.2019 Download
Corrigendum-IV to NIT No. 232/P&D/2019 (Bid No. B-576). Superintending Engineer/P-II (MM), UHBVN, Panchkula. Extension of Last Date of Submission. 18.03.2019 Download
NIT No. 253/XEN/P-III/MM/QH-II/2016 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. LT 4 Core PVC Cable of size 4CX50 sq. mm (Un-armoured). 29.03.2019 Download
NIT No. 252/XEN/P-III/MM/QST-II/2015 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. LT 4 Core PVC Cable of size 4CX25 sq. mm (Un-armoured). 29.03.2019 Download
NIT No. 251/UH/MM/XEN/P-III/QH-II/2014 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. LT PVC Cable (Un-armoured) of 4Cx16 sq. mm size. 29.03.2019 Download
NIT No. 250/UH/MM/XEN/P-III/MM/QST-II/2013 Dated 08.03.2019. Superintending Engineer/P-II (MM), UHBVN, Panchkula. LT XLPE Armoured Cable of size SCX120 sq. mm. 20.03.2019 Download
NIT No. WS-1034 Dated 08.03.2019. Superintending Engineer/Stores & Workshop, UHBVN, Ambala. Providing rate contract labour for outsourcing the repair of Aluminium wound conventional type damaged distribution transformers of ratings 25,63 & 100 KVA. 29.03.2019 Download
NIT No. 239/XEN/R-II/2019 (Bid No-583). Chief Engineer PD&C, UHBVN, Panchkula. Replacement of bare conductor with LT XLPE Armoured Cable, shifting of meter from consumer premises............. in Operation Sub Urban Divn Panipat. 05.04.2019 Download
NIT No. 238/XEN/R-II/2019 (Bid No-582). Chief Engineer PD&C, UHBVN, Panchkula. Replacement of bare conductor with LT XLPE Armoured Cable, shifting of meter from consumer premises.............in Operation Division Smalakha. 05.04.2019 Download
NIT No. 78. Chief Engineer/HPPC, UHBVN, Panchkula. Procurement of 97MW (RTC) non solar RE power limited up to 490 MUs from 1st April. 2019 to 31st October 2019. 18.03.2019 Download
NIT No. 01/JJR/2019-20. Superintending Engineer/OP UHBVN, Jhajjar. Different kind of Works related to 11 KV feeders, HT/LT Lines & 33 KV Lines & Erection of S/Stn equipment at 33 KV S/Stn. 28.03.2019 Download
Dropping of NIT No. 232/UH/MM/XEN/P-III/QST-II/1995 Dated 05.11.2018. Superintending Engineer/P-II, UHBVN, Panchkula. Dropping of NIT No. 232/UH/MM/XEN/P-III/QST-II/1995 Dated 05.11.2018.   Download
Dropping of NIT No. 231/UH/MM/XEN/P-III/QST-II/1994 Dated 05.11.2018. Superintending Engineer/P-II, UHBVN, Panchkula. Dropping of NIT No. 231/UH/MM/XEN/P-III/QST-II/1994 Dated 05.11.2018.   Download
Dropping of NIT No. 230/UH/MM/XEN/P-III/QST-II/1993 Dated 05.11.2018. Superintending Engineer/P-II, UHBVN, Panchkula. Dropping of NIT No. 230/UH/MM/XEN/P-III/QST-II/1993 Dated 05.11.2018.   Download
Corrigendum-III to NIT No. 232/P&D/2019 (Bid-576). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-III to NIT No. 232/P&D/2019 (Bid-576). 08.03.2019 Download
Corrigendum-III to NIT No. 235/P&D/2019 (Bid-579). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-III to NIT No. 235/P&D/2019 (Bid-579). 08.03.2019 Download
Corrigendum-III to NIT No. 236/P&D/2019 (Bid-580). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-III to NIT No. 236/P&D/2019 (Bid-580). 08.03.2019 Download
NIT No. 237/P&D/2019 (Bid-581). Chief Engineer PD&C, UHBVN, Panchkula. Supply & Erection of 66 KV Towers and Stringing of conductor on existing 33 KV.............. 14.03.2019 Download
Corrigendum to NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Last Date of Submission extended. 14.03.2019 Download
Corrigendum-4 to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Last date Extended. 19.03.2019 Download
NIT No. 31/AMB/2018-19 Dated 28.02.2019. Superintending Engineer/OP, UHBVN, Ambala. Supply of Material, Erection Testing & Commissioning for Shifting of HT dangerous electricity lines.......... 18.03.2019 Download
NIT No. 30/AMB/2018-19 Dated 28.02.2019. Superintending Engineer/OP, UHBVN, Ambala. Supply of Material, Erection Testing & Commissioning for Shifting of HT dangerous electricity lines.......... 18.03.2019 Download
NIT No. 29/AMB/2018-19 Dated 28.02.2019. Superintending Engineer/OP, UHBVN, Ambala. Supply of Material, Erection Testing & Commissioning for Shifting of HT dangerous electricity lines.......... 18.03.2019 Download
Corrigendum XVI to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum XVI to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. 18.03.2019 Download
Corrigendum-I to NIT No 21/IPDS/PMA/ERP/2019. Chief Technology Officer, UHBVN, Panchkula. Corrigendum-I to NIT No 21/IPDS/PMA/ERP/2019.   Download
Corrigendum-II to NIT No. 236/P&D/2019-20 (Bid-580). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-II to NIT No. 236/P&D/2019-20 (Bid-580). 27.02.2019 Download
Corrigendum-II to NIT No. 235/P&D/2019-20 (Bid-579). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-II to NIT No. 235/P&D/2019-20 (Bid-579). 27.02.2019 Download
Corrigendum-II to NIT No. 232/P&D/2019-20 (Bid-576). Superintending Engineer P&D, UHBVN, Panchkula. Corrigendum-II to NIT No. 232/P&D/2019-20 (Bid-576). 28.02.2019 Download
NIT No. 232/P&S/USM-454/Vol-I Dated 21.02.2019. Chief Engineer/MM, UHBVN, Panchkula. LL-1 Checking Report Book. 13.03.2019 Download
Corrigendum-III to NIT No 20/IPDS/Non R-APDRP/IT Phase-II/2018. Executive Engineer/R-APDRP, UHBVN Panchkula. Corrigendum-III to NIT No 20/IPDS/Non R-APDRP/IT Phase-II/2018. 08.03.2019 Download
Corrigendum-3 to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Corrigendum-3 to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. 28.02.2019 Download
Corrigendum to NIT No 31/CCR/2018-19. Dated 24-12-2018 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Annual Building Maintanance & repair of 33 KV S/Stn. 06.03.2019 Download
NIT No 37/CCR/2018-19. Dated 18-02-2019 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Construction of Vehicle Parking Shed..... 06.03.2019 Download
NIT No 36/CCR/2018-19. Dated 18-02-2019 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Construction of Interlocking paver Block Road at 33 KV S/Stn. Kahanaur. 06.03.2019 Download
NIT No 35/CCR/2018-19. Dated 18-02-2019 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Construction of VCW at 33 KV S/Stn. Salhawas Jhajjar. 06.03.2019 Download
NIT No 34/CCR/2018-19. Dated 18-02-2019 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Construction of Parking shed..... 06.03.2019 Download
NIT No 33/CCR/2018-19. Dated 18-02-2019 Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Annual Maintanance & repair of 33 KV S/Stn. 06.03.2019 Download
Corrigendum to NIT No 3/2018-19. Executive Engineer OP Divn., UHBVN, Kurukshetra. Corrigendum to NIT No 3/2018-19. Hiring of Vehicle. 26.02.2019 Download
Corrigendum to NIT No. 236/P&D/2019/Bid No. B-580. Chief Engineer/P&D, UHBVN, Panchkula. Corrigendum to NIT No. 236/P&D/2019/Bid No. B-580. 21.02.2019 Download
Corrigendum-I to NIT No. 235/P&D/2019/Bid No. B-579. Chief Engineer/P&D, UHBVN, Panchkula. Corrigendum-I to NIT No. 235/P&D/2019/Bid No. B-579. 20.02.2019 Download
Corrigendum-I to NIT No. 234/P&D/2019/Bid No. B-578. Chief Engineer/P&D, UHBVN, Panchkula. Corrigendum-I to NIT No. 234/P&D/2019/Bid No. B-578. 05.03.2019 Download
Corrigendum to NIT No. 232/P&D/2019 (B-576) Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum to NIT No. 232/P&D/2019 (B-576) 20.01.2019 Download
NIT No 03/CE/Comml/RA/CS/2018-19 Dated 14.02.2019. Chief Engineer/Commercial, UHBVN, Panchkula. Consultancy assitance to UHBVN & DHBVN for Filling MYT Petition/Regulatory works and various operations and functions related to distrribution utilities. 08.03.2019 Download
NIT No 21/IPDS/PMA/ERP/2019. Chief Technology Officer, UHBVN, Panchkula. Engagement of PMA for ERP Project Implementation & Monitoring in UHBVN and DHBVN. 05.03.2019 Download
Corrigendum-II to NIT No. 76. Chief Engineer/HPPC, UHBVN, Panchkula. Corrigendum-II to NIT No. 76. 25.02.2019 Download
Corrigendum XV to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum XV to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. 25.02.2019 Download
Corrigendum to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Corrigendum to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. 18.02.2019 Download
NIT No. 02/2019-20 Dated 06.02.2019. Superintending Engineer Const. Circle, UHBVN, Panchkula. Transportation of loding/unloding of 33 KV S/Stns........... 22.02.2019 Download
NIT No. 01/2019-20 Dated 06.02.2019. Superintending Engineer Const. Circle, UHBVN, Panchkula. Supply of unskilled and skilled labour for augmentation of equipment of 33 KV S/Stns........... 25.02.2019 Download
NIT No 5/OP City Divn.Rtk/2018-19 Dated 07.02.2019. Executive Engineer City. Divn., UHBVN, Rohtak. Hiring of Jeep (Bolero). 15.02.2019 Download
NIT No 4/OP City Divn.Rtk/2018-19 Dated 07.02.2019. Executive Engineer City. Divn., UHBVN, Rohtak. Hiring of Jeep (Bolero). 15.02.2019 Download
Corrigendum-I to NIT No. 76. Chief Engineer/HPPC, UHBVN, Panchkula. Corrigendum-I to NIT No. 76. 13.02.2019 Download
NIT No. 245/UH/MM/XEN/P-III/MM Dated 01.02.2019. Superintending Engineer/P-I, UHBVN, Panchkula. 65 Ah (12V) UPS Batteries for UPS................. 12.02.2019 Download
NIT No 23/XEN/XEN City KNL/2018-19 Dated 01.02.2019. Executive Engineer City. Divn., UHBVN, Karnal. Hiring of Jeep/Bolero........ 15.02.2019 Download
Corrigendum X to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum X to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565.   Download
Corrigendum XIV to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum XIV to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23.   Download
NIT No 22/XEN City KNL/2018-19 Dated 01.02.2019. Executive Engineer City. Divn., UHBVN, Karnal. Hiring of Jeep (Bolero). 15.02.2019 Download
NIT No 05/OP City Divn.Rtk/2018-19 Dated 31.01.2019. Executive Engineer OP City. Divn., UHBVN, Rohtak. Hiring of Jeep (Bolero). 07.02.2019 Download
NIT No 04/OP City Divn.Rtk/2018-19 Dated 31.01.2019. Executive Engineer OP City. Divn., UHBVN, Rohtak. Hiring of Jeep (Bolero). 07.02.2019 Download
Corrigendum-X to NIT No 222/P&D/Zone-I/2018-19/Bid No. B-565. Chief Engineer/MM, UHBVN, Panchkula. Corrigendum-X to NIT No 222/P&D/Zone-I/2018-19/Bid No. B-565. 15.02.2019 Download
NIT No. 236/P&D/2019/Bid No. B-580. Chief Engineer/P&D, UHBVN, Panchkula. Supply of matrial, erection, testing & commissioning for shifting of new 33 kv dangerous lines of approximate length 26.94 kms....... 14.02.2019 Download
NIT No. 235/P&D/2019/Bid No. B-579. Chief Engineer/P&D, UHBVN, Panchkula. Supply of matrial, erection, testing & commissioning for shifting of new 33 kv dangerous lines of approximate length 57.94 kms....... 13.02.2019 Download
EOI No. 01/KNL/2018-19. Executive Engineer/SU Divn. No. 2, UHBVN, Karnal. For Cleaning & Sweaping activity for various offices....... 22.02.2019 Download
Corrigendum to NIT No. 55/XEN/SU-II/2018-19. Dated 11.01.2019. Executive Engineer/SU Divn. No. 2, UHBVN, Karnal. Corrigendum to NIT No. 55/XEN/SU-II/2018-19. Dated 11.01.2019. 01.02.2019 Download
Corrigendum XIII to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum XIII to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. 07.02.2019 Download
Corrigendum IX to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum IX to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565. 07.02.2019 Download
Corrigendum to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Corrigendum to NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. 11.02.2019 Download
NIT No. 231/UH/XEN/P-II/MM/QH-I/2535 Dated 25.01.2019. Superintending Engineer/P-I, UHBVN, Panchkula. Truck Mounted multifunction machines(Cranes). 05.02.2019 Download
Dropping of NIT No. 225/UH/XEN/P-II/MM/QH-I/2529 Dated 17.09.2018. Superintending Engineer/P-I, UHBVN, Panchkula. Dropping of NIT No. 225/UH/XEN/P-II/MM/QH-I/2529 Dated 17.09.2018.   Download
NIT No. 76. Chief Engineer/HPPC, UHBVN, Panchkula. For purchase of short term Non Solar Renewable Power. 06.02.2019 Download
NIT No. 234/P&D/2018/Bid No. B-578. Chief Engineer/P&D, UHBVN, Panchkula. Supply, erection, testing, installation & commissioning of new 11 kv lines....... 14.02.2019 Download
Corrigendum-IV to NIT No. 228/UH/MM/XEN/P-IV/MM/QH-II/1991 Dated 31.10.2018. Superintending Engineer/P-I, UHBVN, Panchkula. Corrigendum-IV to NIT No. 228/UH/MM/XEN/P-IV/MM/QH-II/1991 Dated 31.10.2018.. 14.02.2019 Download
Corrigendum to NIT No. 227/UH/MM/XEN/P-IV/MM/QH-II/1990 Dated 25.09.2018. Superintending Engineer/P-I, UHBVN, Panchkula. Corrigendum to NIT No. 227/UH/MM/XEN/P-IV/MM/QH-II/1990 Dated 25.09.2018. 14.02.2019 Download
Dropping of NIT No. 223/QH-1/2528/UH/P&S/USM-454 Dated 06.08.2018. Superintending Engineer/P-I, UHBVN, Panchkula. Dropping of NIT No. 223/QH-1/2528/UH/P&S/USM-454 Dated 06.08.2018.   Download
NIT No. 77/CE/HPPC/300 MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN, Panchkula. Procurement of 300 MW Solar Power. 08.02.2019 Download
NIT No. 230/UH/MM/XEN/P-II Dated 18.01.2019. Superintending Engineer/P-I, UHBVN, Panchkula. 3 Phase 11KV/433-250V, 100 kVA oil immersed, naturally cooled Aluminum... 22.02.2019 Download
NIT No. 229/UH/MM/XEN/P-II Dated 18.01.2019. Superintending Engineer/P-I, UHBVN, Panchkula. 3 Phase 11KV/433-250V, 16 kVA oil immersed, naturally cooled Aluminum... 15.02.2019 Download
NIT No. 228/UH/MM/XEN/P-II Dated 18.01.2019. Superintending Engineer/P-I, UHBVN, Panchkula. 3 Phase 11KV/433-250V, 25 kVA oil immersed, naturally cooled Aluminum... 08.02.2019 Download
NIT No. 233/P&D/2019 (B-577) Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning of 12 No new 33 KV S/Stns.......... 16.01.2019 Download
NIT No. 232/P&D/2019 (B-576) Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning of 06 No new 33 KV S/Stns.......... 16.01.2019 Download
Corrigendum-II to NIT No 20/IPDS/Non R-APDRP/IT Phase-II/2018. Chief Technology Officer, UHBVN Panchkula. Corrigendum-II to NIT No 20/IPDS/Non R-APDRP/IT Phase-II/2018. 24.01.2019 Download
NIT No 9/2018-19 Dated 10.01.2019. Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Hiring of 1 no private vehicle..... 29.01.2019 Download
Corrigendum to NIT No 24/CCR/2018-19 Dated 05.11.2018. Executive Engineer Civil Const. Divn., UHBVN, Rohtak. A/Mtc of NRB at 33 KV S/Stn..... 21.01.2019 Download
NIT No 32/CCR/2018-19 Dated 10.01.2019. Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Construction of SHB and allied civil Works..... 25.01.2018 Download
Corrigendum to NIT No 31/CCR/2018-19 Dated 16.11.2018. Executive Engineer Civil Const. Divn., UHBVN, Rohtak. Corrigendum to NIT No 31/CCR/2018-19 Dated 16.11.2018. 21.01.2019 Download
NIT No. 55/XEN/SU-II/2018-19 Dated 11.01.2019 Executive Engineer, SU/ Div No 2. UHBVN, Panchkula. Hiring of one no jeep/Bolero.......... 21.01.2019 Download
NIT No. 231/P&D/2018 Superintending Engineer/P-II(MM), UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning of 06 No new 33 KV S/Stns.......... 04.02.2019 Download
NIT No. 230/P&D/2019 (B-574). Superintending Engineer/P-II(MM), UHBVN, Panchkula. Supply of Material, Erection Testing & Commissioning of 06 No new 33 KV S/Stns.......... 05.02.2019 Download
Corrigendum VIII to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum VIII to NIT No. 221/UH/JICA/AMB/2018-19/Bid No-565. 21.01.2019 Download
Corrigendum VII to NIT No. 220/UH/JICA/AMB/2018-19/B-564/Pkg-28. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum VII to NIT No. 220/UH/JICA/AMB/2018-19/B-564/Pkg-28. 23.01.2019 Download
Corrigendum XII to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. Chief Engineer/PD&C, UHBVN, Panchkula. Corrigendum XII to NIT No. 210/UH/JICA/AMB/2018-19/B-555/Pkg-23. 23.01.2019 Download
NIT No. 229/P&D/2019 Dated 04.01.2019. Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection testing & commissioning for construction of 07 no new 33 KV S/Stn........... 29.01.2019 Download
NIT No. 228/P&D/2019 Dated 04.01.2019. Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection testing & commissioning for construction of 07 no new 33 KV S/Stn........... 29.01.2019 Download
NIT No. 227/P&D/2019 Dated 04.01.2019. Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection testing & commissioning for construction of 07 no new 33 KV S/Stn........... 29.01.2019 Download
NIT No. 226/P&D/2019 Dated 04.01.2019. Chief Engineer/PD&C, UHBVN, Panchkula. Supply of Material, Erection testing & commissioning for construction of 08 no new 33 KV S/Stn........... 31.01.2019 Download
Corrigendum-III to NIT No. 228/UH/MM/XEN/P-IV/MM/QH-II/1991 Dated 31.10.2018. Superintending Engineer/P-II(MM), UHBVN, Panchkula. Corrigendum-III to NIT No. 228/UH/MM/XEN/P-IV/MM/QH-II/1991 Dated 31.10.2018 18.01.2019 Download
Corrigendum-V to NIT No 227/UH/MM/XEN/P-IV/MM/QH-II/1990 Dated 25.09.2018. Superintending Engineer/P-I(MM), UHBVN, Panchkula. Corrigendum-V to NIT No 227/UH/MM/XEN/P-IV/MM/QH-II/1990 Dated 25.09.2018. 18.01.2019 Download
NIT No 77/CE/HPPC/SOLAR/300MW Dated 03.01.2019. Chief Engineer/HPPC, UHBVN Panchkula. Procuement of 300 MW of Solar Plant from Grid Connected Solar PV Power Project. 28.01.2019. Download
Corrigendum-VIII to NIT No 222/P&D/Zone-I/2018-19/Bid No. B-565. Chief Engineer/MM, UHBVN, Panchkula. Corrigendum-VIII to NIT No 222/P&D/Zone-I/2018-19/Bid No. B-565. 14.01.2019 Download