Web Content Display

SALES CIRCULARS 2011

Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2010 , 2009 , 2008 , 2007 , 2006 , 2005 , 2004 , 2003 , 2002 , 2001 , 2000 , DST Circulars & Instructions
 

Sales Circular No. Subject Sales Instruction No. Subject
U- 01/2011 Exemption from payment of Electricity Duty to the Special Economic Zones in Haryana. U-01/2011 Temporary Empanelment of firms for purchase of LT CTs, 11 KV CTs and 11 KV PTs by the consumers.
U-2/2011 Voluntary Disclosure Scheme for declaration of un-authorized load VDS-2010-11. U-02/2011 Temporary Empanelment of firms for supply of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB through the applicant.
U-3/2011 Levy of peak load exemption charges for power during peak load hours. U-03/2011 Temporary Empanelment of firms for supply of Single-Phase Static Energy Meters (with LCD/LED Display) of rating 10-60 A (with communication facility) with MCB.
U- 04/2011 Issue of Notifications/Government Orders pursuant to the Industrial & Investment Policy-2011-regarding. U-04/2011 Periodic Inspection of field stores to ensure adequate availability of items.
U-05/2011 Connection on 33 KV line and above. U-05/2011 Recovery of Dues and redressal of grievances.
U-06/2011 Levy of monthly minimum charges U-06/2011 Periodic Inspection of substations and feeders and maintaining feeder wise energy data.
U-07/2011 Construction of independent industrial feeder for single or a group of industrial consumers (for 11KV level). U-07/2011 Capacity of transformers commensurate with load installed by HT consumer.
U-08/2011 Release of power connections to tubewell under AP category U-08/2011 Temporary Empanelment of firms for supply of 3 phase 4 wire LT-CT Operated Static energy meters through applicant.
U-09/2011 Interest on staff security, meter security and consumption security deposit for the year 2011-12. U-09/2011 Conversion of feeding source from Rural to Urban mode viz-a-viz redefining of MC limits.
U-10/2011 Release of power connections to the Tubewells under modified scheme. U-10/2011 Delegation of power for sanction of load
U-11/2011 Guidelines for release of power connections to the Tube-wells under revised scheme. U-11/2011 Distribution Line Losses.
U-12/2011 Schedule of tariff for supply of energy U-12/2011 Unlawful changes in Ledger/Proper Record of Input Data(Advice Form)
U-13/2011 Implementation of Short Term Open Access within the State of Haryana– Cross subsidy surcharge and wheeling charges. U-13/2011 Temporary Empanelment of firms for purchase of LT CTs,11KV CTs and 11KV PTs by the consumers.
U-14/2011 Release of power connections to tubewell under AP category U-14/2011 Constitution of Special Courts at District Head Quarters in the State of Haryana under section-153 of Electricity Act–2003.
U- 15/2011 Providing dedicated transformers to a Group of existing LT Agriculture Pumping category consumers. U-15/2011 Calculation of AT &C losses
U- 16/2011 Guidelines for release of power connection under modified HVDS Scheme. U-16/2011 Empanelment of firms for supply of Single-Phase Static Energy Meters (with LCD/LED Display) of rating 10-60 A (with communication facility) with MCB.
U- 17/2011 Guidelines for release of power connections under modified HVDS scheme. U-17/2011 Empanelment of 3 Phase 4 Wire LT CT Operated (built–in) Static Energy meter (40-200amp).
U-18/2011 Construction of independent feeder for single or a group of consumers (for 11KV level)- Clarification thereof- SC No.U-07/2011 dated 01.03.2011. U-18/2011 Distribution Line Losses
U-19/2011 Levy of peak load exemption charges for power during peak load hours. U-19/2011 Empanelment of firms for supply of 3 phase 4 wire LT-CT Operated Static energy meters through applicant.
U-20/2011 Release of Power Connection to the tube-wells under AP category. U-20/2011 Temporary Empanelment of firms for supply of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB through the applicant
U-21/2011 HERC regulations on duty to supply electricity on request-Self execution of works in respect of AP tubewell connections. U-21/2011 Shifting/ Release of Industrial/NDS load from RDS/AP feeders to urban/ mixed urban/ Industrial feeder
U-22/2011 Amendments in the procedure of the load survey of Domestic and Non-domestic Consumers- Clarification thereof. U-22/2011 Temporary empanelment of firms for purchase of 33 KV CTs/PTs by the consumer.
U-23/2011 VDS for declaration of un-authorized load-2011 U-23/2011 Recovery of Connected and Disconnected defaulting amount.
U-24/2011 assessment of units consumed for theft of electricity U-24-2011 Empanelment of firms for purchase of LT CTs, 11 KV CTs and 11 KV PTs by the consumers.
U-25/2011 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN. U-25-2011 Empanelment for supply of 3 Phase, 4 Wire Static HT CT/PT Operated Trivector Energy Meter of 0.5S Class Accuracy through consumers in UHBVN.
U-26/2011 Schedule of tariff for supply of energy for FY 2011-2012 U-26-2011 Conversion of existing connections with load between 50 kW to 70 kW to HT category.
U-27/2011 Schedule of General and Miscellaneous Charges. U-27-2011 Empanelment of firms for supply of 3 phase 4 wire LT-CT Operated Static energy meters for deretailed supply through consumers.
U-28/2011 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN. U-28-2011 Empanelment for supply of 3 Phase, 4 Wire Static HT CT/PT Operated Trivector Energy Meter of 0.5S Class Accuracy through consumers in UHBVN.
U-29/2011 Billing of consumers during the period when the meter remains defective/ dead stop/ burnt /faulty or inoperative/premises locked. U-29-2011 Resolving the issue of Pending applications- Prompt Service to citizens.
U-30/2011 Involvement of Gram Panchayats as facilitator and motivator in the enhancement of the collection and recovery of power bills. U-30-2011 Empanelment of 3 Phase 4 Wire LT CT Operated (built–in CT) Static Energy meter (40-200amp).
U-31/2011 HERC regulations on duty to supply electricity on request- Self execution of works in respect of AP tubewell connections. U-31-2011 Resolving the issue of Pending applications- Prompt Service to citizens.
U-32/2011 Streamlining of Citizen Centric Services. U-32-2011 Empanelment of 3 Phase 4 Wire LT CT Operated (built–in CT) Static Energy meter (40-100amp).
U-33/2011 Schedule of tariff for supply of energy for FY 2011-2012- Clarification U-33-2011 Conversion of existing connections with load between 50 kW to 70 kW to HT category
U-34/2011 Schedule of Tariff for Supply of energy for FY 2011-12. U-34-2011 Financial distress- curbing theft, pursuance of recovery of connected defaulters and reducing losses.

Web Content Display