Sales Circular No. Subject Sales Insruction No. Subject
U-01-2005.doc Shifting of tubewell connection from one site to another in the event of acquisition of land by HUDA or other state agencies 01-2005.doc Temporary empanelment of firms for 3 phase 4 wires static LT CT meters with MDI features.
U-02-2005.doc Instructions for dealing with the cases of Theft of Electricity under section-135 of the Electricity Act-2003 02-2005.doc Removal of cable, meter and other equipment from consumer's premises while effecting PDCO.
U-03-2005.doc Instructions for dealing with the cases of unauthorized use of Electricity under section-126 of the Electricity Act-2003.  03-2005.doc Temporary empanelment of firms for purchase of three phase 4 wires whole current meters with MCB and without MDI OF REATING 20-60 Amps by consumers.
U-04-2005.doc Release of power connection to the tubewells under AP category 04-2005.doc Transfer of defaulting amount of consumers to permanent Defaulting ledgers.
U-05-2005.doc Regularization of "Reduction in load of Existing Industrial Consumers". 05-2005.doc Providing independent feeders for Lift irrigation System.
U-06-2005.doc Temporary empanelment of firms for purchase of three phase 4 wires whole current  electronic energy meters of rating 10-40 Amps (with electromechanical counter) with MCB by consumers 06-2005.doc Temporary empanelment of firms for purchase of three phase 4 wire meters with MCB of rating 20-60 Amps by consumers.
U-07-2005.doc Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers 07-2005.doc Testing and sealing of meters.
U-08-2005.doc Conversion of feeding source from Rural to Urban feeder. 08-2005.doc Procedure for returning of defective electronic meters within warranty period to stores by the field offices.
U-09-2005.doc Interest on meter security deposit and staff security. 09-2005.doc Recovery of arrears for Defaulting Domestic, Non-domestic and Industrial Consumers under the Haryana Government Electrical Undertakings (Dues Recovery) Act, 1970.
U-10-2005.doc Shifting of the metering equipment of the consumer near the factory gate. 10-2005.doc Introduction of MT-2 Performa for joint checking of CT-PT meters.
U-11-2005.doc Voluntary Scheme for declaration of un-authorized loads -          VDS - 2005. 11-2005.doc Tightening of Loose HT & LT lines/wires.
U-12-2005.doc Amendments to Instructions for dealing with the cases of Theft of Electricity under section-135 issued vide S.C. U-2 / 2005 & cases of Unauthorized use of Electricity under section-126 issued vide S.C. No. U-3 /2005 12-2005.doc Replacement of existing three phase electromechanical meters with electronic meters.
U-13-2005.doc Levy of surcharge on Bulk Supply Consumers for exceeding the sanctioned load/contract demand 13-2005.doc Providing meter terminal cover and cover seals.
U-14-2005.doc Grant of more than one connections of NDS category in a premises- clubbing of loads 14-2005.doc Checking of consumer's premises.
U-15-2005.doc HERC Regulations on Electricity supply Code 15-2005.doc Voluntary scheme for declaration of un-authorized loads- VDS-2005.
U-16-2005.doc Voluntary Scheme for declaration of un-authorised load – VDS-2005. 16-2005.doc Arrears of Electricity Duty.
U-17-2005.DOC Voluntary Scheme for declaration of un-authorised load – VDS-2005. 17-2005.doc Guidelines for dealing with electrification Plan of Group Housing Society.
U-18-2005.doc Release of Power connection to the tubewells under general category. 18-2005.doc Provision of shunt Capacitors in respect of Agriculture Power Supply, LT Industrial (Small Power and medium supply), Public Water Works Supply & 33KV Sub Stations.
U-19-2005.doc Instructions for dealing an act of abetment for theft of electricity under Section-150 of the Electricity Act, 2003. 19-2005.doc Site checking of meters.
U-20-2005.doc Release of power connection to the tubewell under General category. 20-2005.doc Temporary empanelment of firms for purchase of 3 phase, 4wire whole current electronic meter with MDI of 10-60. A rating by consumers.
U-21-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas. 21-2005.doc Recording of meter reading.
U-22-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- First Clarification. 22-2005.doc Temporary empanelment of firms for purchase of 3 phase, 4wire whole current electronic meter with MCB and with/without MDI of rating 20-60 Amps. by consumers.
U-23-2005.doc Charging of domestic tariff instead of non-domestic tariff to elementary schools. 23-2005.doc Temporary empanelment of firms for purchase of 3 phase, 4 wire whole current electronic energy meter of rating 10-40 Amps (with electromechanical counter) with MCB by consumers.
U-24-2005.doc Voluntary Scheme for declaration of unauthorized load – VDS-2005. 24-2005.doc Temporary empanelment of firms for 3 phase 4 wires static LT CT meters Class 1.0 accuracy with MDI features.
U-25-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Second Clarification. 25-2005.doc Provision of Augmentation of distribution transformer in the estimate.
U-26-2005.doc Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. 26-2005.doc Revision of permissible tolerance limits for the energy meters of class 1.0 / 0.5 accuracy.
U-27-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Third Clarification. 27-2005.doc Release of Power connection to the tube wells under AP category.
U-28-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Fourth Clarification. 28-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas – Special Campaign for reconnection of disconnected Domestic Consumers.
U-29-2005.doc Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. 29-2005.doc Temporary empanelment of firms fro purchase of 3 phase, 4 wire whole current electronic energy meters of rating 10-40 Amps (with electromechanically counter) with MCB by consumers.
U-30-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Fifth Clarification. 30-2005.doc Capacity of T/F commensurate with load installed by HT consumer.
U-32-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- sixth Clarification. 31-2005.doc Method of Power line crossing of Railway Tracks.
U-33-2005.doc Shifting of the metering equipment of the consumer near the factory gate. 32-2005.doc Temporary empanelment of firms for 3 phase 4 wire static LT CT meters class-1 accuracy with MDI features.
U-34-2005.doc Temporary empanelment of firms for purchase of 3 phase, 4 wire whole current static meter with MDI of 10-60 A rating by consumers. 33-2005.doc i) Shifting of industrial load from rural to urban feeder.

ii) Release of industrial connection from urban feeder instead of rural feeder whereas rural feeder is near to the premises of Industrial units.

U-35-2005.doc Release of power connection to the tubewells under general category- Priorities to various categories of consumers regarding. 34-2005.doc Settlement of pending Electricity Bills of rural Domestic and Agriculture category of consumer in rural area – Special Campaign for reconnection of disconnected domestic consumer.
U-36-2005.doc Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. 35-2005.doc No Demand Certificate to be issued by UHBVN regarding no dues with regard to payment of electricity are pending to the consumers (Agriculturist) for grant of exemption from payment of stamp duty on mortgage deed.
U-37-2005.doc Voluntary Disclosure Scheme for declaration of un-authorised loads of DS, NDS and Agriculture Power Consumers – VDS- 2005. 36-2005.doc Appeal to the Power consumers regarding meter and service cable.
U-38-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Seventh Clarification. 37-2005.doc Construction of residences/other buildings beneath LT/HT lines.
U-39-2005.doc Release of power connection to tubewells used for fish farming – on priority. 38-2005.doc Guidelines for dealing with electrification plan of Group Housing Society
U-40-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Eighth Clarification. 39-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas – 17th Clarification.
U-41-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- Ninth Clarification on meter security in installments.    
U-42-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 10th Clarification.    
U-43-2005.doc Discount of 10 paisa per unit in Domestic Tariff rates to women in case of properties are owned by women and the domestic electricity connection is in the name of that women on that property.    
U-44-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 11th  Clarification.    
U-45-2005.doc Interest on meter security deposit and staff security deposit.    
U-46-2005.doc Effect of magnetic influence on electronic energy meters – instructions for dealing the cases of theft of energy – clarifications thereof.    
U-47-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 12th Clarification on meter security in installments.    
U-48-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 13th Clarification.    
U-49-2005.doc Extension in time limit of the demand notices of Industrial applications.    
U-50-2005.doc Theft of energy by LT Industrial consumer having load more than 35 KW and upto 70 KW.    
U-51-2005.DOC Distribution of Electricity Bills in Rural Areas/Urban Areas.    
U-52-2005.doc Scheme for out of court settlement of pending court cases.    
U-53-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 14th Clarification on Part payment.    
U-54-2005.doc Directions for efficient use of energy and its conservation in the State of Haryana.    
U-55-2005.doc Exemption from the levy of Electricity Duty on all persons generating energy for his own use for 5 years from 1st April, 2005 to 31st March, 2010.    
U-56-2005.doc Release of Power Connection for Mega Projects, 100 percent EOUs and FDI Projects-On Priority.    
U-57-2005.doc Penalty for un-authorised extension in load by NDS consumer- change of category from LT to HT – clarification thereof.    
U-58-2005.doc Release of Power connection to the tubewells under AP category –Revival of cancelled AP applications who were defaulters in rural domestic category.    
U-59-2005.doc Release of tubewell connection under General Category/Dedicated transformers.- Limiting L.T. line length.    
U-60-2005.doc Advance Consumption Deposit (ACD) for the Industries having connected load more than 20 KW and monthly bill amount more than Rs.5000/- .     
U-61-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 15th Clarification.    
U-62-2005.doc Amendment relating to competency of officers in the matter of sanction of load for new connections, extension of load in the case of existing connections and reduction in load.    
U-63-2005.doc Independent feeder for Government Hospitals,  Public Health-Water Works, Defence Services, Telephone Exchange, All India Radio, Railway and Educational Institutions  having total connected load of 100 KW or more.    
U-64-2005.doc Providing dedicated transformers to a Group of existing LT Agriculture Pumping category consumers.    
U-65-2005.doc Release of Power connection to the tubewells under AP category. Revival of  AP application- cancelled due to death of applicant.    
U-67-2005.doc Release of power connection to the tubewells under AP category.    
U-68-2005.doc Execution of HT works relating to provision of Independent feeder, conversion from rural supply to urban supply and release of new connections/ extension of load.    
U-69-2005.doc HERC Regulations No. HERC/12/2005 on "Power to Require Security" under Section-47 of the Electricity Act-2003.    
U-70-2005.doc Providing of 25/63KVA transformer by applicants for release of tubewell connections.    
U-71-2005.doc Release of Power Connection to the tubewells under AP category.    
U-72-2005.doc Scheme for out of court settlement of pending Court cases.    
U-73-2005.doc HERC Regulations No. HERC/12/2005 on "Duty to Supply on Request" under Section-43 of the Electricity Act-2003.    
U-74-2005.doc Railway Traction Tariff- Regarding SOP charges and imposition of incentive/penalty on account of Power factor – Clarification thereof.    
U-75-2005.doc Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 16th Clarification.    
U-76-2005.DOC Temporary empanelment of firms for purchase of single phase electronic meters(with electromagnetic counter) of rating 5-20 A/10-40 A with MCB.    
U-77-2005.doc Advance consumption deposit (ACD) for the Industries having connected load more than 20 KW and monthly bill amount more than Rs. 5000/- viz-a-viz withdrawal of sales Circular No. U-60/2005.    
U-78-2005.doc Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers.    
U-79-2005.doc Temporary empanelment of firms for purchase of single phase electronic meters (with electromagnetic counter) of rating 5-20A/10-40 A with MCB.     
U-80-2005.doc Temporary empanelment of firms for purchase of 3 phase 4 wire electronic energy meters of rating 10-40 Amps (with electromechanical counter) MCB by consumers.    