Web Content Display

SALES CIRCULARS 2004

Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2006 , 2005 , 2003 , 2002 , 2001 , 2000 , DST Circulars & Instructions
 

Sales Circular No. Subject Sales Instruction No. Subject
U-1/2004 Installation of Three-Phase Electro-Mechanical meters with MCBs on flat rate tubewell connections. 1/2004 Temporary empanelment of firms for 3 phase 4wire static LT-CT meters.
U-2/2004 Replacement of existing three phase Electro-Mechanical meters with Electronic meters. 2/2004 Providing standard MCBs and extensive inspection of consumer premises.
U-3/2004 Amendments in view of the provisions of The Electricity Act, 2003-- Disconnection of Supply in Default of Payment. 3/2004 Replacement of HT meter of Nigam with consumer meter.
U-4/2004 Revision of Norms for site checking of CT meter by M&P wing. 4/2004 Release of connections of Saw Mills, Veneer and Plywood Industries
U-5/2004 Issue rate for three-phase electronic meters 10-40 amps and 20-60 amps with MCB. 5/2004 Implementation of revised and simplified A&A Forms for DS/NDS, Agriculture and L.T. Industries Consumers.
U-6/2004 Granting of concession for RCO to permanently disconnected tube well owners- applied within 6 months of PDCO. 6/2004 Empanelment of M/s Secure Meters Ltd., Udaipur for the supply of 3 phase 4 wire Trivector Meter class accuracy 0.5 through consumers in UHBVN
U-7/2004 Release of power connection to the tubewells under general category. 7/2004  
U-8/2004 Unauthorised use of energy by HT consumers. 8/2004 Charging cost of single-phase electronic meters.
U-9/2004 Amendments in the procedure of the load survey of Domestic and Non-domestic Consumers 9/2004 Payment of municipal tax & service charges etc. in Electricity Bills to local Bodies in respect of Central Govt. Offices.
U-10/2004 Shifting of Industrial connections from one site to another in the event of acquisition of land by HUDA or other State agencies. 10/2004 Acceptance of A&A forms directly from consumers and not through any outside agency i.e. electrical contractors/shopkeepers etc.
U-11/2004 Reconnection of permanently disconnected tubewells. 11/2004 Economic Analysis of Power Consumption Pattern.
U-12/2004 Amendments in view of the provisions of The Electricity Act, 2003-- Release of connections of the prospective consumers. 12/2004 Transfer of defaulting amount of consumer to permanent defaulting ledger.
U-13/2004 Amendments in view of the provisions of The Electricity Act, 2003—Notification by the Government. 13/2004 Temporary Empanelment of firms for purchase of three phase, 4 wire whole current electronic meters without MDI of rating 20-60 Amps by consumers.
U-14/2004 Instructions for dealing with the cases of unauthorized use of Electricity. 14/2004 Replacement of cable with cuts/joints before the meter.
U-15/2004 Supply of Power as per urban area to villages/towns located within vicinity of 33 KV and above capacity sub-stations and within/nearby cities. 15/2004 Economic Analysis of Power Consumption Pattern.
U-16/2004 Release of power connection to the tubewell under AP category – Cancellation of non-complying applications. 16/2004 Supply of Power as per urban area to villages/towns located within vicinity of 33KV and above capacity sub-stations and within/near by cities.
U-17/2004 Incentive for recovery of defaulting amount outstanding against permanently disconnected private consumers. 17/2004 Procedure for dealing with cases of theft of energy levy of charges.
U-18/2004 Dishonour of cheque. 18/2004 Detection of Un-authorized Connections in Urban Areas.
U-19/2004 Unauthorized Connections in Urban Areas. 19/2004 Release of power connection to the tube well.
U-20/2004 Distribution of Electricity Bills in Rural Areas through Village Panchayats. 20/2004 Shifting of metering equipment of the consumer near the Factory Gate.
U-21/2004 Empanelment of M/s. Duke Arnics Electronics Pvt.Ltd.,Hyderabad for purchase of HT Electronic trivector meters to be supplied by the consumers. 21/2004 Temporary empanelment of firm for purchase of three phases 4 wires whole current electronic meters without MDI of rating 20-60 Amps by consumers.
U-22/2004 O&M Charges. 22/2004 Issue rate for single phase and three phase Electronic Meters of various rating with MCB for the year 2004-2005.
U-23/2004 O&M Charges. 23/2004 Issuance of NOC for electricity, water and sewerage connections within Municipal Limits.
U-24/2004 Unauthorized Connections in Urban Areas/Areas having supply on urban mode. 24/2004 Non-effecting of Disconnection Orders.
U-25/2004 Release of power connection to the tubewells under AP category. 25/2004 Review of load norms for flats constructed by group Housing societies and Sectors/Colonies developed by HUDA/Private Colonizers.
U-26/2004 Theft of energy by LT industrial consumer having load more than 35 KW and upto 70 KW.    
U-27/2004 Amendments in Instructions for dealing with the cases of unauthorized use of Electricity and Theft of Electricity (U-14 /2004).    
U-28/2004 Replacement of damaged distribution transformer installed against Tatkal Scheme 2001.    
U-29/2004 Release of Temporary connection for  Horticulture Cultivation on the leased land.    
U-30/2004 Release of power connection to the tubewells under AP category.    
U-31/2004 Amendments in the procedure of the load survey of domestic and non-domestic consumers.    
U-32/2004 Hiring of Nigam's Poles for laying cable TV net work by small cable operators.    
U-33/2004 Revised Rates of Power Tariff and Monthly Minimum Charges for Agriculture Pumping (AP) Supply in UHBVN.    
U-34/2004 HERC Regulations on Standards of Performance of Distribution Licensee.    
U-35/2004 Levy of departmental charges on Deposit Works.    
U-36/2004 Procedure for change of name, if a person purchases land alongwith structures/tubewell but the change of name cannot be allowed due to the "No Objection" by the tubewell owner not being available with the purchaser.    
U-37/2004 Granting of concession for RCO to permanently disconnected consumers applied within 3 months of PDCO.    
U-38/2004 Procedure to be adopted in case of change of consumer's name, specifying the eligibility criteria and /staticContent/documents required for affecting the change of consumer's name.    
U-39/2004 Procedure of Extension of load of tubewell motors by the legal heir   in case of death of original consumer.    
U-40/2004 Extension / reduction of load in Agriculture category in respect of Defaulting consumers.    
U-41/2004 Release of connection in unauthorized colonies – levy of Development charges.    
U-42/2004 Regularization of "Extension in load of Existing Industrial Consumers".    
U-43/2004 Procedure for change of name, if a person purchases land alongwith structures/tubewell but the change of name cannot be allowed due to the "No objection" by the tubewell owner not being available with the purchaser.    
U-44/2004 Electrification of Dhanies/small Hamlets for release of domestic connection.    
U-45/2004 Release of Power connection to the tubewell under AP category- Extension in time for applicants of tubewell connection who deposited consent money.    
U-46/2004 Review of load norms for Flats constructed by Group Housing Societies and Sectors/Colonies developed by HUDA/Private Colonizers.    
U-47/2004 Release of power connection to the tubewell under AP category.    

Web Content Display