Web Content Display

SALES CIRCULARS 2003

Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2006 , 2005 , 2004 , 2002 , 2001 , 2000 , DST Circulars & Instructions
 

Sales Circular No. Subject Sales Instruction No. Subject
1/2003 Reconnection of HSMITC tube wells to the Water User Associations. 1/2003 Procedure for dealing with the cases of theft of energy- Levy of charges.

2/2003

Guidelines for deferment/waiver of power bills in view of the drought conditions in the State.

2/2003

Issue of Sales Circular.
3/2003 Release of single phase domestic and non-domestic as "Adhoc Connections" in UHBVN: Shortage of single phase electronic meters           3/2003 Electricity Duty.
4/2003 Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers. 4/2003 Release of New connection to a permanently disconnected premise.

5/2003

Charging of ACD in the event of change in the name of a Company.

5/2003

Release of tubewell connection under General Category (who have deposited Rs.20, 000/- plus Rs.7000/- per span of LT/HT).
6/2003 Construction of industrial feeders for group of industries – levy of Departmental charges. 6/2003 Release of tubewell connection under General Category (who have deposited Rs.20, 000/- plus Rs.7,000/- per span of LT/HT.
7/2003 Billing of consumers on "Faulty Meter Basis"-Framing of theft cases of where meter is found burnt. 7/2003 Tampering with the working of LT, CT, electronic meter Monitoring of "Power on time" recorded by the meters.
8/2003 Release of power connection to the tube wells under AP category- Condition regarding holding of minimum 2 acres of agriculture land for getting out of turn priority in respect of applicants belonging to Schedule Caste/disabled/handicapped categories. 8/2003 Applicability of 25% LT surcharge in case of HT Industrial Consumers getting supply on LT when the billing is on MMC basis.
9/2003 Granting of RCO to permanently disconnected tube well connections. 9/2003 Reduction of load by Agriculture power category of consumers.
10/2003 Release of power connection to the tube wells under A.P. category.. 10/2003 Installation of push-fit type Electronic Meters.
11/2003 Providing dedicated transformers to a Group of existing LT/Agriculture Pumping category consumers. 11/2003 Code of practice on of electricity bills/ disconnection of supply & Complaint handling procedure.
12/2003 Facility of advance payments of electricity bills by consumers and payment of incentive there against. 12/2003 Temporary Empanelment of firms for 3 Phase 4 wire Whole Current Static energy Meters of rating 10-40 Amps. (Without MCB) for release of new DS/NDS connections.
13/2003 Clearing of the outstanding dues by the Domestic, Non-domestic and AP consumers in rural areas by availing the final surcharge waiver scheme. 13/2003 Release of tube well connection under general category to individual where owner ship of the Land in the Joint name.
14/2003 Release of Power Connection to the Tube wells under AP Category. 14/2003 Release of new connections/replacement of defective meters with dismantled electromechanical meters of rating 20-60A.
15/2003 Applicability of rebate on MMC in case of power factor increase above 90%. 15/2003 Temporary empanelment of firms for 3 phase 4 wire static LT CT meters with MDI feature.
16/2003 Procedure for dealing of theft of energy, lodging of FIR- in case the payment is made by the person/consumer within 72 hours. 16/2003 Temporary empanelment of 18 No. firms for 3 phase 4 wire whole current static meters of rating 10-40 Amp (without MCB) and without MDI for release of new DS/NDS and industrial connections and also for replacement of defective meters up to 30.11.2003.
17/2003 Providing dedicated transformers to a Group of existing LT Agriculture Pumping category consumers.                 17/2003 Applicability of rebate on MMC in case of power factor increase above 90%.
18 Dup/2003 Refunding of lump-sum amount in theft cases, where assessed amount is reduced by Appellate Authority. 18/2003 Return of the defective/burnt/obsolete design meters to M&T lab.
19/2003 Release of single phase domestic and non-domestic as Adhoc connections in UHBVN shortage of single phase electronic meters. 19/2003 Non-charging the meter rental where cost of the meter has been recovered.
21/2003 Replacement of 3 phase electromechanical meter for domestic consumers up to 20KW-Procedure for dealing with theft/suspected theft cases. 20/2003 Cuts in service cable suspected extraction of power.
22/2003 Recording of monthly reading of HT electronic trivector meters installed on HT Industrial consumers through MRI/CMRI and sealing thereof.. 21/2003 Temporary empanelment of 18 No. firms for 3 phase 4 wire whole current static energy meters of rating 10-40 Amp (without MCB) and without MDI for release of new DS/NDS and industrial connections and also for replacement of defective meters up to 31.01.2004.
23/2003 Providing of 25KVA transformer by applicants for release of tube well connections.    
24/2003 Revision of Norms for site checking of CT meters by M&P wing.    
25/2003 Charging of ACD in the event of change in the name of a Company.    
26/2003 Interest on Meter Security Deposits.    
27/2003 O&M charges.    
28/2003 Release of tube well connections- Maintaining of separate seniority of applications.    
29/2003 Shifting of existing 11KV/33KV line against deposit estimates- procedure for preparing the deposit estimate.    
30/2003 Scheme for payment of current bills by Domestic, Non-domestic and   agricultural consumers pertaining to problematic villages.    
31/2003 Granting of  RCO to permanently disconnected tube well connections.    
32/2003 Recovery of electricity arrears from the second/subsequent owner of Industrial Units purchased from Haryana Financial Corporation through other Govt. Agencies.    
33/2003 Providing of 25KVA transformer by applicants for release of tube well connections.    
34/2003 O&M charges.    
35/2003 Procedure for dealing with the cases of theft of energy-Calculation of units consumed for levying penalty.    
36/2003 O&M charges.    
37/2003 Rationalization of penalty to be imposed in case of detection of un-authorized extension in load by A.P. consumers.    
38/2003 Scheme for payment of current bills by Domestic, Non-domestic and agricultural consumers pertaining to problematic villages.               
39/2003 Scheme for Out of Court settlement of pending court cases.    
40/2003 Scheme for payment of current bills by Domestic, Non-domestic and agricultural consumers pertaining to problematic villages.    
 41/2003 Replacement of three phase electromechanical meter for domestic consumers up to 20 KW-Procedure for dealing with theft/suspected theft cases.    
42/2003 Providing better service to the consumers-instructions regarding.    
43/2003 Release of tube well connection-Maintaining of separate seniority of applications.        
44/2003 Providing separate NDS connection to Industrial consumers for lighting purpose on request.    
45/2003 Hiring of Nigam's Poles for laying Cable TV Network by small Cable Operators.    
46/2003 Converaion of feeding source from rural to urban feeder.    
47/2003 Replacement of three phase whole current electro mechanical/electronic meters and disposal thereof.    
48/2003 O&M Charges.    
49/2003 Change of name of applicant/connection to legal heir.    
50/2003 Levy of surcharge on the dues raised through the energy bill and not paid within the grace period and surcharge in case of part-payment.    

Web Content Display