Web Content Display

SALES CIRCULARS 2001

Archive: 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2006 , 2005 , 2004 , 2003 , 2002 , 2000 , DST Circulars & Instructions
 

Sales Circular No. Subject
U-01/2001 metering arrangment for SawMills
U-02/2001 applicable tariff for mushroom farming
U-03/2001 Revised rates for power tariff in UHBVN.
U-04/2001 Schedule of tariff for supply of energy and general and miscellaneous charges.
U-05/2001 Revised rate of monthly minimum charges in UHBVN.
U-06/2001 Schedule of general and miscellaneous charges.
U-07/2001 Action plan for installation of 1,70,000 single phase meters by M/s Emco and disposal plan in view of replacement.
U-08/2001 VDS Scheme 2001 of DS and NDS Consumers for declaration of tempered and faulty meters and unauthorized load.
U-09/2001 HERC order on distribution and detail supply AAR and tariff 2000 accounting of units.
U-10/2001 Providing dedicated transformer to existing individuals LT APC consumers.
U-11/2001 New Surcharge waiver scheme , 2001.
U-12/2001 Procedure for dealing with cases of theft.
U-13/2001 New surcharge waiver scheme, 2001.
U-14/2001 Installation plan for 1,69,500 single phase electronic meters.
U-15/2001 Sanction of extension in load by DS and NDS
U- 16/2001 Procedure for dealing with cases of theft of energy.
U-17/2001 Release of tubewell connection under Tatkal scheme.
U-18/2001 New surcharge waiver scheme, 2001.
U-19/2001 Procedure for dealing with cases of theft.
U-20/2001 Release of single phase DS and NDS connections.
U-21/2001 Conversion of existing LT Industrial connections.
U-22/2001 Replacement of existing electro-mechanical meters by electronic meters.
U-23/2001 Replacement of defective metes of metered tubewell.
U-24/2001 New surcharge waiver scheme, 2001.
U-25/2001 Volunteer scheme for declaration of un-authorised load, 2001
U-26/2001 Connected load of DS and NDS consumers
U-27/2001 Adjustment of securities toward arrear of energy bills.
U-28/2001 Interest on meter security deposits.
U-29/2001 Reduction of load upto 10 KW.
U-31/2001 Providing CT connected meters.
U-32/2001 Tatkal scheme for Release of tubewell connections.
U-33/2001 Shifting of tubewell connections.
U-34/2001 Connected load of DS and NDS consumers
U-35/2001 Drinking water tubewell owned by village Panchayats consumer category
U-36/2001 VDS for declaration of un-authorised load.
U-37/2001 Load survey of domestic and non-domestic consumers
U-38/2001 Dealing of theft cases.
U-39/2001 Connection to Group Housing Societies.
U-40/2001 Voluntary Scheme for declaration of un-authorised load, 2001
U-41/2001 Settlement of pending theft cases.
U-42/2001 Settlement of disputed cases of un-authorised extension in connected loads..
U-43/2001 Surcharge waiver scheme during month of April.
U-44/2001 Levy of fuel surcharge adjustment.
U-45/2001 Reduction of load upto 10 Kw.
U-46/2001 Volunteer scheme for declaration of un-authorised load, 2001
U-47/2001 Surcharge waiver scheme during month of April.
U-48/2001 Settlement of pending theft cases of DS and NDS.
U-49/2001 Settlement of pending theft cases of DS and NDS and industrial consumers
U-50/2001 Surcharge waiver scheme during the month of May, 2001.
U-51/2001 Tatkal scheme 2001 for grant of single pole LT cable and HT connection.
U-52/2001 Temporary empanelment of firms for purchase of single phase meters .
U-53/2001 Grant of priority to agriculture consumers toward release of connection.
U-54/2001 Voluntary scheme for declaration of un-authorised load, 2001
U-55/2001 Temporary empanelment of firms for purchase of single phase meters and three phase meters.
U-56/2001 Release of c connections to the Flat owners of Group Housing
U-57/2001 Revised rate of monthly minimum charges in UHBVN.
U-58/2001 Tatkal scheme , 2001 for grant of single core LT cable HT connection.
U-59/2001 Installation of whole current three phase electronic meters.
U-60/2001 Grant of facilities to the consumers self assessment on energy payment defaults
U-61/2001 Installation of whole current three phase electronic meters..
U-62/2001 Release of connections to the DS and NDS consumers in village.
U-63/2001 Providing dedicated transformers to existing individual LT agriculture pumping category.
U-64/2001 Penalty for un-authorised extension in load on LT Industrial consumers.
U-65/2001 Release of new connections and replacement of defective meters.
U-66/2001 Tatkal scheme for release of tubewell connections.
U-67/2001 Release of connection to DS and NDS consumers in villages.
U-68/2001 Release of new connection and replacement of defective meters.
U-69/2001 Schedule of negative list
U-70/2001 Revised rate of tariff in UHBVN.
U-71/2001 Replacement of defective meters – Stay order of Court.
U-72/2001 Accuracy of energy meters – Installation of check meters.
U-73/2001 Procedure for checking the accuracy of the energy meters (at site) suspected/found to be incorrect.
U-74/2001 Voluntary Scheme for declaration of unauthorized loads – VDS -2001.
U-75/2001 Voluntary Disclosure scheme 2001 of DS, NDS, Industrial and Agriculture consumers for declaration of tempered and faulty meters.
U-76/2001 Voluntary scheme for declaration of un-authorised load
U-77/2001 Release of power connection to the tubewell under general category
U-78/2001 VDS 2001 of DS, NDS and Agriculture.
U-79/2001 Surcharge waiver scheme for agriculture in domestic consumer in urban and rural areas.
U-80/2001 Penalty for un-authorised extension in load on LT industrial consumers.
U-81/2001 Metering arrangement for saw mills.
U-82/2001 VDS scheme 2001 of DS , NDS and AP consumers.
U-83/2001 Relaxation in effecting TDCOs seasonal cotton based industry in Haryana
U-84/2001 Supply of consumer meter – packing and sealing thereof.
U-85/2001 Surcharge waiver schema e for agriculture and DS consumer in urban and rural areas.
U-86/2001 Voluntary scheme for declaration of un-authorized load.
U-87/2001 Release of power connections to the tubewell under general category.
U-88/2001 Surcharge waiver scheme for NDS consumers in rural areas.
U-89/2001 Release of power connection to tubewells under general category.
U-90/2001 Wheeling charges for use of distribution and transmission system.
U-91/2001 Surcharge waiver scheme for Agriculture and domestic consumers.
U-92/2001 Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs.
U-93/2001 VDS-2001 for domestic and non-domestic and agriculture consumers.
U-94/2001 Surcharge waiver scheme for AP and DS consumers in urban & rural areas.
U-95/2001 Release of power connections to the tubewells under general category.
U-96/2001 Release of electric connection in un-authorized colonies.
U-97/2001 Distribution of energy bills in villages.
U-98/2001 Temporary empanelments of firms for the sale of single phase and three pahase electronic meters.
U-99/2001 Acceptence of LT CT, 11 KV CTs and PTs from consumers.
U-100/2001 Exemption from payment of electricity duty.
U-101/2001 Refund/Adjustment of advance payment for transformer and other allied equipments of existing LT industrial connections.

Web Content Display